7
10.
Refer to
Figure 2-7
. Clean the top of the canopy ribs and carriage bolt head (about 2 inches each side of bolt) with
cloth dampened in rubbing alcohol. Allow surface to dry.
11.
Cut supplied Velcro material per cutting chart below.
12.
Remove peel-off backing of Velcro strips to expose adhesive.
13.
Position center of Velcro strip over carriage bolt head in line with canopy rib.
14.
Press down firmly over entire length of Velcro strip to secure it to bolt head and rib.
VELCRO CUTTING CHART
Canopy Length
Quantity
Velcro Cut Length
30’
15
4”
32’
15
4”
36’
17
4”
40’
19
4”
Figure 2-7.
Velcro Strip Installation
15.
Refer to
Figure 2-8
. Place the canopy fabric bundle on top of the canopy frame and unfold down the length of the
frame; then unfold across the width. Pull fabric snugly over the frame.
Содержание VL10K Guide On HD
Страница 12: ...10 Figure 2 10 Complete Canopy Framework...