3.
Check the engine air cleaner and air intake screen for dirt or obstruction. Clean as required.
4.
Move choke control to choke or start position and move throttle to half throttle position to start a cold engine. Move
choke control to run position slowly after engine starts and allow a warm up. The choke must be in the run position
during normal operation or when starting a warm engine. Placing the throttle in the slow position before stopping the
engine permits a cooling period.
4.2.2
Electric Motor Startup
WARNING:
DO NOT USE IN WET CONDITIONS.
1.
The motor is rated at 1 1/2 HP, 110/220V, 60 cycles. It is wired at the factory for 110 volt, single phase service. A
20amp service is required to run this unit. Consult the nameplate for wiring changes required for 220 volt, single-
phase service.
WARNING:
USE A 20 AMP/110V OUTLET SERVICE FOR OPERATION. ALSO USE SIZE A 5O FT 12/3
EXTENSION CORD. FAILURE TO USE PROPER SERVICE COULD RESULT IN MOTOR
FAILURE.
To protect the motor and get maximum motor efficiency, be sure the extension cords used conform to the following table:
0-50 ft. ................................. .......................... 12 gauge two wire and ground
50-150 ft. ............................. .......................... 10 gauge two wire and ground
150-250 ft. ........................... .......................... 8 gauge two wire and ground
NEVER use 16-gauge wire as an extension cord on a 1 1/2 HP motor.
4.3
RAISING AND LOWERING THE LOAD
WARNING:
NEVER EXCEED THE RATED LOAD CAPACITY OF 200 POUNDS FOR THE PRO200
HOIST, OR 400 POUNDS FOR THE PRO400 HOIST. THE RATED LOAD CAPACITY IS
THE MAXIMUM LOAD THAT SHOULD EVER BE APPLIED TO THE HOIST.
WARNING:
SECURE THE LOAD BEFORE LIFTING.
WARNING:
DO NOT OPERATE HOIST WHEN BRAKE ROPE IS WET
1.
Before operating install the operator handle using the provided spring lock.
2.
Make a few “dry runs” (no load), to test hoisting operation, controls, and PRO Drive.
WARNING:
NEVER STAND IN-LINE WITH THE RAISING OR LOWERING OF THE PLATFORM AT
EITHER THE TOP OR BOTTOM OF THE HOIST TRACK.
3.
To raise the load, first advance the throttle to increase the engine speed. Then lift the operator handle slowly with a
smooth upward motion. This automatically tightens the drive belt and releases the brake, permitting the platform to
roll up the track.
6
Содержание PRO Drive E
Страница 2: ......
Страница 20: ...15 Figure 6 4 PRO DRIVE BRAKE ADJUSTMENT...
Страница 23: ...18 Figure 8 1 PRO Drive Gas Assembly Drawing...
Страница 25: ...20 Figure 8 2 PRO Drive Electric Assembly Drawing...