background image

Table of contents

1.    INTRUDCTION
1.1  PRECAUTIONS
1.2  TRANSPORT
1.3  PACKAGE CONTENT
1.4  USE AND PRINCIPLE OF OPERATION 
2.    SCHEMATIC DIAGRAM
2.1  CONSTRUCTION
2.2  DIMENSIONS
2.3  TECHNICAL DATA
3.    ASSEMBLY
4.    INSTALLATION INSTRUCTIONS
5.    PRECAUTIONS & WARNINGS
6.    CONTROLS
7.    CONNECTION SCHEMES
8.    TERMS OF WARRANTY
8.1  WARRANTY CARD
8.2  WARRANTY FORM
8.3  SERVICE FORM

  ENG

 

     

 

TECHNICAL DOCUMENTATION

1. INTRODUCTION

Thank you very much for purchasing Reventon Group's destratification fan. We 
woud like to congratulate you on good choice.

1.1  PRECAUTIONS

The  buyer  and  the  user  of  the  device  should  read  carefully  the  following 
instructions and proceed to the content recommendations. Proceeding due to 
the following instruction guarantees the correct usage and safety. In case of any 
doubts please contact the producer. The producer reserves the rights to make 
changes to the technical documentation without previous notice. The producer 
is not responsible for the damages which occur due to improper installation, not 
keeping the device in repair or using the device out of line. The installation should 
be  carried  out  by  the  professional  installers,  who  possess  the  qualications  to 
install  these  types  of  devices.  The  installers  are  responsible  for  making  the 
installation as instructed in the technical data. Regulations and safety rules must 
be followed. During the installation, use, service and periodical inspections all 
regulations and safety rules must be followed. In case of unserviceable please 
plug out the device and contact with the authorized person or the producer.
 

 

 

1.2  TRANSPORT

During  the  acceptance  of  goods  it  is  needed  to  check  the  device  in  order  to 
exclude  any  damages.  During  the  transport  it  is  needed  to  use  the  proper 
equipment,  it  is  necessary  to  carry  the  device  by  two  people.  In  case  of  any 
damages please ll in the damage report in presence of the supplier.

1.3  PACKAGE CONTENT

- Destratification fan
 - Instruction and warranty card

1.4 USE AND PRINCIPLE OF OPERATION

In the heated high large-spaces the air mass is located in the upper part of room, 
which causes the heat loss. Destratification fans also called the drop fans or air 
mixers are used to save on heating. They steer the air back to work zone at the 
same time they level out the air temperature in the high room, they also limit the 
heat loss through the roof. They are used in production halls, warehouses and 
logistic centres.  

2. SCHEMATIC DIAGRAM

2.1 CONSTRUCTION

- Casing
- Round 360° diffuser
- Axial fan
- Rotational holder

Casing: 

made of expanded polypropylene EPP, resistant, light and reliable. The 

material is capable of carrying considerable loads without deforming. It does not 
degrade  under  the  influence  of  a  lubricant,  oil,  crude  oil  and  the  majority  of 
chemicals. It has an excellent sound insulation properties, that is why it is used as 
casings, material is environmentally friendly and "green", i.e. 100% recyclable. 
Aesthetic design gives new nature to the device.  

Round 360° diffuser: 

cover plate made of galvanized steel. Cover plate made of 

galvanized steel. It allows the even air flow in the room.

Axial  blowing  fan:

  protective  grid  made  of  galvanized  steel,  metal  blades. 

The motor has got the safety degree IP 54. Rated current 1,08A. 1-phase device, 
3-stage fan. 

Rotating mounting bracket:  

made of steel, element for mounting the device on 

wall  or  ceiling.  Soild  and  durable  construction,  possible  to  assemble  device  in 
parallel on the angle  60º .  Possible rotation horizontally.

2.2 DIMENSIONS

CASING HC

height: 

698 mm

width: 

739 mm

depth: 

340 mm

a) 
b) 
c) 

2.3 TECHNICAL DATA

The measurement at a distance of 5 m from the unit.

3. ASSEMBLY

Destratification  fans  can  be  assembled  on  the  wall  or  ceiling  via  rotating 
mounting bracket. The drawings below show the ways of assembly. In the bigger 
accommodation it is recommended to assemble more than one device. Follow the 
parameters which are provided on the drawings.

4. INSTALLATION INSTRUCTIONS

The installation should be made by the qualified staff, who possess the needed 
rights to install electrical devices, as instructed in the following documentation. 

The duct size for air water heaters Reventon Group HC-3S should be chosen by 
the designer.

5. PRECAUTIONS & WARNINGS

All works concerning electrical installation should be made by the qualified staff, 
who  possess  the  qualifications  due  to  the  domestic  and  local  norms.  These 
recommendations include service and disassembly as well. Not following to the 
recommendations  may  cause  electrocution,  device  damages  or  its  incorrect 
work.

- Before service or exchange of the device it is obligatory to cut off the current 
suply.
- Do not cover the inlet and outlet of the device.
- Do not use the device in room with high moisture or close to the water basin.
- Do not install, service the device with wet hands or barefoot.
- Do not use the device in room with flammable fumes, gas and high concentration 
of dust.
– The device should be kept out of reach of children and animals.
– It is recommended to check the electric installation before the first start.
- It is recommended to use the external current dierential protection.
- After operating time of the device, please utilize it concerning the local norms 
and regulations.

Drawing 1. Assembly on the ceiling.

c

a

b

m³/h

m

A

V/Hz

W

Rev./min

-

dB

5100

14

1,08

230/50

250

1350

54

III stage - 57 

II stage - 52 

I stage - 44

26

vertical

horizontally

Technical data

Maximum airflow

Maximum range of air stram

Rated current

Power supply voltage

Motor power

Noise 

*

Motor speed

Motor IP

Unit of measure

Destartification fan HC

Отзывы: