12
CASE DESIGN & FIELD SERVICE PARTS LIST, CONT’D: SHELVING ASSEMBLY COMPONENTS
4. Shelf Assembly Components
Note: After case is in place & level (before startup),
remove shelfing retainer clips (sample clip shown
below-right).
Check that glass shelving is in proper position before
placing product in case
Shelves may be adjusted vertically or entirely removed
from merchandiser.
Metal shelving brackets ARE NOT able to be angled.
They are at a fixed 90° position.
These components comprise EACH shelf assembly.
FIELD SERVICE PARTS LIST: SHELVING ASSEMBLY COMPONENTS
P/N
COMPONENT NAME
AMT
P/N
COMPONENT NAME
AMT
15
GLASS, LEFT/RIGHT HAND
2
20
SHELF GUARD, FRONT POLYCARBONATE*
1
16
SHELF GUARD, REAR POLYCARBONATE*
1
21
LIGHT, LED
1
17
SHELF SUPPORT RAIL, OUTER**
2
22
BRACKET, RIGHT HAND
1
18
SHELF SUPPORT RAIL, INNER
2
23
THUMB SCREW, SHELF SUPPORTS
4
19
BRACKET, LEFT HAND
2
24
BUMPER STAND
8
* Polycarbonate does NOT need to be removed to remove shelf assemblies from case.
** Assembled with shelf support rail, inner (item #18) and thumb screw (item #23) before leaving the factory.
23
1
21
16
24
From Factory: Transparent 2-Sided Tape Holds
Glass To Top Of Rear Shelf Support Rail
Shelving Retainer Clips
Are To Be Removed
After Case Is In Place &
Level (Before Startup)
15
20
19
18
17
22