background image

Refilling the PLT

®

 Air Cylinder

Depending on national rules, the Air Cylinder can be 
filled with 207 bars (3000 psi) or 300 bar (4350 psi) 
compressed air. A minimum of 207 bar (3000 psi) 
contains enough air for 4 max. launches. When filled 
to 300 bar (4350 psi), it contains enough air for 6 max. 
launches.

For filling to 300 bar (4350 psi), connect the PLT

®

 Air 

Cylinder to a standard scuba diving (breathing air) 
compressor with standard 5/8” threads according to DIN 
477.

For filling to 207 bar (3000 psi), normally a yoke adaptor 
ANSI -CGAV1/1989 is used. A fitting for this standard is 
available from Restech Norway AS (Art. No. 1308.)

Filling the Air Cylinder is dictated by national rules, and 
should be carried out by skilled personnel. After filling, 
make sure that the Closing Valve is closed, also when it 
is attached to the Launching Unit. Do not use excessive 
force when closing the valve.

NEVER FILL OXYGEN INTO THE AIR 
CYLINDER. CLEAN AND DRY AIR ONLY

Maintenance Procedure of the 

PLT

®

 Air Cylinder

In general, the PLT

®

 Air Cylinder and Closing Valve are maintenance free. 

However, if leakage is detected, please contact the nearest service station or 
Restech Norway AS.

Depending on national rules the Air Cylinder must be periodically inspected 
and tested. If national rules are not applicable, the Air Cylinder must be 
certified every 5th year by licensed authorities, the nearest service station, or 
Restech Norway AS.

If the Air Cylinder needs to be certified or tested, or shows signs of damage or 
corrosion, please contact the nearest service station or Restech Norway AS.

Found stamped on the bottleneck:

Manufacturing Year: 

Indicated by year and month: 2016 / 05 - example

Serial Number:   

The serial number will look like: RN 7384 - example

Last testing date is found on the bottle neck.

12

13

Содержание PLT Solas

Страница 1: ...tenance manual for the PLT Solas This manual should be read before operating the PLT For easy registering the information you need is the serial number for your PLT Solas The serial number is Version...

Страница 2: ...producer and seller cannot be held responsible for damage caused by the PLT Solas if the product is not used according to this manual Always inspect the launching unit rope and projectile before use...

Страница 3: ...lls from a 207 300 bar air compressor for breathing air systems If you are using a 207 bar compressor the Yoke Adaptor Art No 1308 is necessary to use Launching unit Weight Length 7 5 kg 65 cm 16 5lb...

Страница 4: ...ube pointing upwards Insert the projectile into the Launching Tube with the line in the slot of the end plug Fig 4 5 Fasten the end of the line to the line thrower or a secured point Fig 5 6 Aim over...

Страница 5: ...using the Damper Pad on the PLT Solas Air Cylinder Cover For maximum distance hold elevation between 25 to 35 Push and hold the safety knob and aim over the target Pull the trigger with a firm and ra...

Страница 6: ...the chamber of the Launching Unit Annual Check Bring the unit outdoors and fill the chamber with compressed air To reduce the noise you can screw the Launching Tube on the Launching Unit but without...

Страница 7: ...n it is attached to the Launching Unit Do not use excessive force when closing the valve NEVER FILL OXYGEN INTO THE AIR CYLINDER CLEAN AND DRY AIR ONLY Maintenance Procedure of the PLT Air Cylinder In...

Страница 8: ...Restech Norway AS www restech no...

Отзывы: