Refilling the PLT
®
Air Cylinder
Depending on national rules, the Air Cylinder can be
filled with 207 bars (3000 psi) or 300 bar (4350 psi)
compressed air. A minimum of 207 bar (3000 psi)
contains enough air for 4 max. launches. When filled
to 300 bar (4350 psi), it contains enough air for 6 max.
launches.
For filling to 300 bar (4350 psi), connect the PLT
®
Air
Cylinder to a standard scuba diving (breathing air)
compressor with standard 5/8” threads according to DIN
477.
For filling to 207 bar (3000 psi), normally a yoke adaptor
ANSI -CGAV1/1989 is used. A fitting for this standard is
available from Restech Norway AS (Art. No. 1308.)
Filling the Air Cylinder is dictated by national rules, and
should be carried out by skilled personnel. After filling,
make sure that the Closing Valve is closed, also when it
is attached to the Launching Unit. Do not use excessive
force when closing the valve.
NEVER FILL OXYGEN INTO THE AIR
CYLINDER. CLEAN AND DRY AIR ONLY
Maintenance Procedure of the
PLT
®
Air Cylinder
In general, the PLT
®
Air Cylinder and Closing Valve are maintenance free.
However, if leakage is detected, please contact the nearest service station or
Restech Norway AS.
Depending on national rules the Air Cylinder must be periodically inspected
and tested. If national rules are not applicable, the Air Cylinder must be
certified every 5th year by licensed authorities, the nearest service station, or
Restech Norway AS.
If the Air Cylinder needs to be certified or tested, or shows signs of damage or
corrosion, please contact the nearest service station or Restech Norway AS.
Found stamped on the bottleneck:
Manufacturing Year:
Indicated by year and month: 2016 / 05 - example
Serial Number:
The serial number will look like: RN 7384 - example
Last testing date is found on the bottle neck.
12
13
Содержание PLT Solas
Страница 8: ...Restech Norway AS www restech no...