8
Operation
Start operation
1. Cleaning the compartment
Before power on, clean inside of the appliance and check the drainage
pipe in good connection.
(
For details, please refer to the “Maintenance
and cleaning”
)
2. Placement
Before powering on, level the appliance on the firm & dry floor for at least
30 minutes.
3. Power on
The appliance start operation and it will cool down inside after 1 hour,
otherwise you should check the power connection.