17
en
Î
Disconnect the expansion vessel from the solar thermal system.
Î
Connect the pressure hose of the filling and flushing
station to the filling valve (5) of the filling and flushing
unit.
Î
Connect the flushing hose of the filling and flushing
station to the drain valve (3) of the filling and flushing
unit.
2.
Pressure hose
Flushing hose
Î
Close the ball valve in the middle of the filling and
flushing unit.
Î
Open the non-return-valves in the flow (1) and the
return (2).
Î
Open the filling valve (5) and the drain valve (3).
3.
Î
Switch on the filling pump.
ON
Î
Flush the solar thermal system for at least 15 minutes
by means of the filling and flushing station until the
discharged solar fluid is free of gas bubbles and dirt
particles.
Î
During flushing, bleed the solar thermal system sev-
eral times until the discharged solar fluid is free of
air bubbles
6.
Î
Close the drain valve (3) of the filling and flushing unit
while the filling pump is running.
7.
Î
Increase the system pressure. The system pressure
can be read from the manometer.
BAR
Î
Close the filling valve (5).
9.
Î
Switch off the filling pump.
Î
Check the manometer to see whether the system
pressure decreases (approx. 15 minutes) and eliminate
leaks where necessary.
Î
Reconnect the expansion vessel to the solar thermal
system.
OFF
Î
Open the filling valve (5) and switch on the filling pump.
Î
Set the operating pressure of the solar thermal system (approx. 0.5 bar higher
than the inlet pressure of the expansion vessel or the value recommended by
the manufacturer).
Î
Switch off the filling pump.
Î
Close the filling valve (5) and open the ball valve (4).
Î
Slowly discharge the heat transfer fluid by means of the drain valve (3) until the
operating pressure (see above) is set.
Î
Remove the hoses of the filling and flushing station and screw the caps onto the
fill and drain valves of the station.
Î
Empty the contents of the hoses into the tank of the filling and flushing station
by carefully loosening the union nuts.
Î
Close the ball valves.
Î
Put the non-return valves in flow and return in operating position.
Î
Manually start the solar thermal pump at maximum speed (see controller man-
ual) and let the fluid circulate for at least 15 minutes.
Î
Bleed the solar thermal system several times until the
discharged fluid is free of gas bubbles.
Î
Check the antifreeze ratio.
11.
%
Î
Drain the tank of the filling and flushing station.
GL
YCOL
Содержание 280 010 90
Страница 11: ...SBS 2000 www resol com Translation of the original instructions Filling and flushing station en ...
Страница 21: ...SBS 2000 www resol com Traduction de la notice originale Station de rinçage et de remplissage fr ...
Страница 31: ...SBS 2000 www resol com es Traducción del manual original Estación de lavado y llenado ...
Страница 41: ...SBS 2000 www resol com Traduzione delle istruzioni originali Stazione di lavaggio e riempimento it ...
Страница 50: ...50 ...
Страница 51: ...51 ...