![resideo VK41 Series Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/resideo/vk41-series/vk41-series_manual_1443877006.webp)
EN1R-1020 1004RA-NE
6
18
+ 0.2
- 0.2
18
+ 0.2
- 0.2
1
23.4
+ 0.2
- 0.2
1
23.4
+ 0.2
- 0.2
1
1
1
.
Fig. 7. External thread connection with nut and olive
Et
With
3
/
4
” nut and “O”-ring (see fig 7.)
Pipe diameter: 15 mm
Nut: drawing: ....................................... 45.006.583-003
“O”-ring size:
∅
14.3 x
∅
2.4 mm
drawing ........................................ 45.001.528-048
Fastening torque: maximum 50 Nm
minimum 10 Nm
Pipe end construction: see fig.: 10.
Fig. 8. External thread connection with nut and “O”-ring
0
With
3
/
4
” nut and flat sealing ring for pipe 15mm (see fig 5.)
Nut: drawing: ....................................... 45.006.583-003
Flat sealing ring size:
∅
24 x
∅
16 x 1.5 mm
drawing ........................................ 45.006.582-001
Fastening torque: maximum 50 Nm
minimum 30 Nm
Pipe end construction: see fig.: 11.
0
With
3
/
4
” nut and flat sealing ring for pipe 18mm (see fig 5.)
Nut: drawing: ....................................... 45.006.583-002
Flat sealing ring size:
∅
24 x
∅
16 x 1.5 mm
drawing ........................................ 45.006.582-001
Fastening torque: maximum 50 Nm
minimum 30 Nm
Pipe end construction: see fig.: 12.
Fig. 9. Pipe (dia 14 mm) for flat sealing ring connection
1
Fig. 10. Pipe (dia 15 mm) for flat sealing ring connection
23.4 – 0.15
Fig. 11. Pipe end for “O”-ring connection
1
Fig. 12. Pipe (dia 15 mm) for flat sealing ring connection
1
Fig. 13. Pipe (dia 18 mm) for flat sealing ring connection
Pilot gas connection at outlet side (if applicable)
•
Square off the end of tubing and remove burrs.
•
Slip compression fitting over 4 mm tubing.
•
Insert tubing into automatic gas control housing until it
bottoms, slide fitting into place and turn finger tight.
•
Use a wrench to tighten fitting about 1
1
/
2
turn beyond
finger tight to shear of the olive.
Do not use jointing
compound.
Connect other end of tubing to pilot burner according to the
manufacturer’s instructions.
CAUTION
Do not bend tubing at gas control after compression
fitting has been tightened, as this may result in gas
leakage at the connection.
Perform gas leak test
WARNING
FIRE OR EXPLOSION HAZARD CAN CAUSE
PROPERTY DAMAGE, SEVERE INJURY OR
DEATH
Check for gas leaks with a rich soap and water
solution any time work is done on a gas control.
1
15
+ 0.10
- 0.05
1.5 – 0.1
7.5 – 0.2
5