
Tactical ResQmax Operation Manual
Tactical ResQmax Operation Manual
5
32
A
Q
How do I know whether or not the
Nozzle Valve is open on a loaded
projectile?
Why is the pressure in the Projectile lower
when I load it in the launcher than it was
when I filled it?
I installed a Projectile Cylinder and
opened the Nozzle Valve, and I hear a
hissing from inside the Launcher Housing
– how do I stop this loss of air pressure?
The Valve Key will only depress fully when
the stem of the Valve Key is aligned with
the stem of the Nozzle Valve. Depress the
Valve Key in the vertical and horizontal
positions. Which ever position permits the
Key to fully depress will represent the
position of the Nozzle Valve. If horizontal
the Valve is Open. If vertical, the Valve is
closed. (fig 16a - d)
When you are filling the projectile with
air it will get warm. This causes the
pressure to rise and you will reach your
target pressure with the air in the bottle
at a temperature higher than ambient.
Once air in the projectile has cooled down
the air will contract and lower the
pressure.
This problem is addressed by two steps:
1. Fill the Projectile Cylinder VERY
SLOWLY.
2. “Overfill” the Projectile by 200 psi./15 Bar
– to allow for the inevitable cooling of
the air after filling. See Filling, page 12)
In order of probability, you need to do the
following;
•
Tighten Bleed Screw on Launcher
Housing. (fig 14a)
•
Check to insure nylon insert is attached
to Bleed Screw. (fig 14b)
•
Check Nozzle Valve O-rings. (fig 23b)
If none of these steps solves the problem
contact your Rescue Solutions
International distributor.
A
Q
A
Q
Safety Sheet
CAUTION:
The use of any other compressed gas - either flammable and/or combustible, may result in a
spontaneous explosion causing severe injuries or death.
CAUTION:
If projectiles are subjected to extreme heat the pressure could rise sufficiently to rupture the
Pressure Relief Assy., and allow the air to escape, preventing use of the equipment. Refer to page
29 for instructions on removing and replacing the Pressure Relief Assy.
IMPORTANT NOTE:
The beveled surface of the neck of the nozzle is subject to wear at the moment of launching. In
normal conditions this part is suitable for 150 or more discharges. Carefully inspect this surface
for excessive wear after each use. If there is any question regarding suitability of this part for
continued use it must be removed from service and inspected by a qualified technician.
NOTE:
Inexpensive replacement cylinders are readily available from the manufacturer.
DO NOT use
a visibly damaged cylinder!
NOTE:
DO NOT coil or loop the line, EVER! If you coil the line you may build in tension that will
cause snarls the next time you use it resulting in poor performance during deployment.
NOTE:
Some initial resistance may be experienced when trying to turn the Valve Key. However once
the Key begins to rotate it will turn easily. Be certain to rotate the Key a full 90 degrees.
Remember
If immersed in seawater, all lines and projectiles must be rinsed with fresh water and dried
thoroughly after use, and prior to being refilled or stored.
ATTENTION:
On firing, the unit exhibits a sound level in excess of 110 dB, which rapidly decays to background
levels within one minute. It is therefore recommended that ear defences systems are used during
operation of the product
The internal mechanism in this appliance is complex – and any maintenance or
repair other than that described in this manual should be performed by a
technician trained by the manufacturer in the repair of this equipment. Please
contact your Rescue Solutions International distributor for more information, call
1-800-709-5018 or e-mail at [email protected].