4-3
Equipment description
The umbilical cable is 2 m in length and provides connection for power and Ethernet. Connection
to the SLM is by means of a Mil-Spec MIL-DTL-26482 Series 1 Plug (Renishaw recommends the
use of Weald LMH06T10.07SN.101). For further details of this cable see section 16, “Appendix B –
Electrical connections”.
4.2.2
Low-voltage power connectors
The 4 mm connector plugs are for connection to a low-voltage dc power supply of voltage range
11 Vdc to 16 Vdc.
For cable pin-outs, see section 16, “Appendix B – Electrical connections”.
4.2.3
Ethernet
The Ethernet connector (standard RJ45) allows for connection to a PC/laptop so that
communication to the SLM 250 can be established.
4.3
Electrical
WARNINGS:
• The SLM 250 has no user-serviceable parts. In the event of a problem, please
contact Renishaw’s Service and Support Centre.
• Do not attempt to open the instrument.
• Always isolate the low-voltage dc source before the instrument is removed
(uninstalled) and/or replaced (installed).
• Appropriate visual inspection and electrical safety testing is to be performed
after instrument installation or replacement.
It is recommended that the SLM 250 is powered from an external 14 Vdc source with a minimum
power capability of 100 W.
Note:
The SLM motor start-up peak current will be higher than its steady running current,
especially when at the low end of its operating temperature range.
Содержание SLM 250
Страница 8: ...SLM 250 installation and operation manual 1 2 General safety This page is intentionally left blank...
Страница 16: ...SLM 250 installation and operation manual 4 4 Equipment description This page is intentionally left blank...
Страница 20: ...SLM 250 installation and operation manual 6 2 Operational guidelines This page is intentionally left blank...
Страница 26: ...SLM 250 installation and operation manual 8 4 Network set up This page is intentionally left blank...
Страница 34: ...SLM 250 installation and operation manual 10 6 Command list This page is intentionally left blank...
Страница 42: ...SLM 250 installation and operation manual 13 2 Beam and tilt angles This page is intentionally left blank...
Страница 46: ...SLM 250 installation and operation manual 15 2 Appendix A Drawings This page is intentionally left blank...
Страница 48: ...SLM 250 installation and operation manual 16 2 Appendix B Electrical This page is intentionally left blank...
Страница 49: ......