( 28 / 42 )
Chapter 4. Usage
4.1 Turning on the Power Supply
(1) Checking the Connections of the System
Before turning on the power, check the connections of the host machine, communications interface
cable, emulator and target system.
(2) Turning On/Off the Power Supply
• When turning on, activate the M32100T-EZ-E first and then the target system.
• When turning off, deactivate the target system first and then the M32100T-EZ-E.
• Always wait for about 10 seconds after turning off the power before turning it on again.
• Power to the emulator is supplied via the USB interface cable.
IMPORTANT
Notes on Power Supply to the Target Board:
• The emulator's pin V
CC
is connected to the target system in order to monitor target
system voltage. For this reason, the emulator cannot supply power to the target
system. Therefore, provide the target system with a separate power supply.
• Do not change the power supply voltage after the target system has been activated.
Note on Power Supply to the Emulator:
• Power is supplied from the host machine to this product via the USB interface cable.
Take note of the fact that by connecting the USB interface cable, the M32100T-EZ-
E is powered on.
Содержание SDI Emulator System M32100T-EZ-E
Страница 3: ...M32100T EZ E User s Manual User s Manual Rev 2 00 2003 09 SDI Emulator System for M32R Family ...
Страница 14: ... 12 42 MEMO ...
Страница 28: ... 26 42 MEMO ...
Страница 32: ... 30 42 MEMO ...
Страница 33: ... 31 42 Chapter 5 Specifications This chapter describes specifications of this product 5 1 Specifications 32 ...
Страница 42: ... 40 42 MEMO ...
Страница 44: ...1753 Shimonumabe Nakahara ku Kawasaki shi Kanagawa 211 8668 Japan M32100T EZ E REJ10J0002 0200Z User s Manual ...