21
15) Test Emulation Monitor
A) EMA23-EMA0 ................................OK
B) ACST2-ACST0 ...............................OK
C) ASEST3-ASEST0 .............................OK
D) ASEBRKACK .................................OK
E) CNN .......................................OK
F) NOCLK .....................................OK
G) WINDOW ....................................OK
Shows the check results for the
emulation monitor controlling
circuits in the E6000 (normal
completion).
16) Test PERFM G/A
A) Time Measurement ..........................OK
B) RESERVED
C) Subroutine Count Measurement ..............OK
D) Timeout Function (TIMOT Bit) ..............OK
E) Timeout Function (TIMOP Bit) ..............OK
Shows the check results for the
performance analysis
controlling circuits in the
E6000 (nomal completion).
17) Test Bus Monitor
A) Register ..................................OK
B) Parallel RAM ..............................OK
C) SPRSEL2 ...................................OK
D) RAM Monitor ...............................OK
Shows the check results for the
bus monitor controlling
circuits in the E6000 (normal
completion).