
TABLE OF CONTENTS
INTRODUCTION.................................................................................
SECTION A – SAFETY.......................................................................
SECTION B – INSTALLATION...........................................................
Pump Dimensions.............................................................
1. PREINSTALLATION INSPECTION...........................................
2. POSITIONING PUMP................................................................
Lifting.................................................................................
Mounting...........................................................................
Clearance..........................................................................
3. SUCTION AND DISCHARGE PIPING......................................
Materials............................................................................
Line Configuration.............................................................
Connections to Pump........................................................
Gauges..............................................................................
4. SUCTION LINES.......................................................................
Fittings...............................................................................
Strainers............................................................................
Sealing..............................................................................
Suction Lines in Sumps.....................................................
Suction Lines Positioning..................................................
5. DISCHARGE LINES..................................................................
Siphoning..........................................................................
Valves...............................................................................
Bypass Lines.....................................................................
6. AUTOMATIC AIR RELEASE VALVE.........................................
Theory of Operation..........................................................
Air Release Valve Installation............................................
7. ALIGNMENT..............................................................................
Coupled Drivers................................................................
V-Belt Drives.....................................................................
SECTION C – OPERATION................................................................
8. PRIMING...................................................................................
9. STARTING................................................................................
Rotation.............................................................................
10. OPERATION...........................................................................
Lines With a Bypass..........................................................
Lines Without a Bypass.....................................................
Leakage............................................................................
Liquids Temperature and Overheating..............................
Strainer Check..................................................................
Pump Vacuum Check.......................................................
11. STOPPING..............................................................................
Cold Weather Preservation...............................................
12. BEARING TEMPERATURE CHECK......................................
Pg. 03
Pg. 04
Pg. 05
Pg. 05
Pg. 06
Pg. 06
Pg. 06
Pg. 06
Pg. 06
Pg. 07
Pg. 07
Pg. 07
Pg. 07
Pg. 07
Pg. 07
Pg. 07
Pg. 07
Pg. 08
Pg. 08
Pg. 08
Pg. 09
Pg. 10
Pg. 12
Pg. 12
Pg. 14
Pg. 15
Pg. 16
Pg. 09
Pg. 09
Pg. 09
Pg. 10
Pg. 11
Pg. 13
Pg. 14
Pg. 15
Pg. 15
Pg. 15
Pg. 15
Pg. 15
Pg. 16
Pg. 16
Pg. 17
Pg. 17
Pg. 17
1
Содержание RT 080
Страница 1: ...OPERATORS MANUAL Installation Operation Maintenance and Parts List RT 080...
Страница 22: ...21 SECTION DRAWING Figure 10 Pump Model...
Страница 24: ...23 SECTION DRAWING DRIVE END VIEW SEAL AREA DETAIL Figure 11 Repair Rotating Assembly...
Страница 38: ...37 NOTES...
Страница 40: ...1800 333 424...