1
A
B
1
B
A
1: Manual bleeding valve
A: Outlet
B: Inlet
Vertical mounting
The condensate drainage line can be connected at
the funnel nozzle. The position of the nozzle can
be selected to be on the left or right. The conden-
sate drainage connection of the condensate tray
which is not used must be permanently sealed. If a
valve assembly is used, the connection must be
made to the additional condensate tray.
Horizontal mounting
The condensate drainage line can be connected
directly to the condensate tray. If a valve assembly
is used, the condensate is conveyed to the unit's
pan and is drained from there.
Possible accessories
n
Room temperature controller
The room temperature controller operates the
unit. The controller can be wall-mounted or
installed in the unit, as required. Follow the
separate installation instructions.
n
Switch relay for 4 units
If several units are to be controlled together in
a group, a switch relay is necessary if room
temperature regulation is used. Follow the sep-
arate installation instructions.
n
Condensate pump
If the condensate which forms is to be removed
by a condensate pump, this can be placed in
the unit. Follow the separate installation
instructions.
REMKO KWK series (DM)
24
Содержание KWK 135 EC
Страница 39: ......