Heat exchanger cleaning
1. Remove revision cover (1).
2. Pull waste gas suppressors (3) out of unit
3. Clean waste gas passes (4).
A special cleaning brush can be obtained as acces-
sories.
4. Clean waste gas suppressors or replace them, if
necessary.
5. Check gasket (2) of revision cover and replace, if
necessary.
5. Disassemble tightening bolts at supports of combus-
tion chamber and pull out combustion chamber side-
ways.
Look out:
Supports of combustion chamber (
1
) may
neither be bent nor damaged!
Combustion chamber cleaning
à
Clean combustion chamber (5) through its opening
(6) by means of a vacuum cleaner.
Special cleaning sets can be obtained as accesso-
ries to the REMKO industrial vacuum cleaner.
1
1
2
3
4
6
5
7
Important Hint!
An operation/use other than that indicated in these in-
structions is prohibited! In the case of non-observation
we will not be held responsible and our guarantee will
become void.
Any claims under guarantee regarding materials can be ac-
cepted only when the orderer or his customer has filled in
completely the
“guarantee certificate”
which is enclosed
with every REMKO-heater and has returned it to REMKO
GmbH & Co. KG in due time after the unit’s sale and com-
missioning.
Burner maintenance
à
Make sure that the burner is exclusively maintained
by authorized experts.
à
Make sure to observe the limit values for waste gas
losses according to the relevant regulations.
à
For safety reasons we recommend that you con-
clude a maintenance contract!
Assembly of combustion chamber
1. Assembly is to be carried out in reverse order.
2. Make sure that the gasket and the revision cover (
1
)
are correctly seated.
3. Insert combustion chamber carefully into unit and
adjust it.
Tightening bolts of supports just should be screwed
in loose.
4. Install burner with burner-flange.
5. Pay attention to the correct distance of burner to
flange.
Approx. 30 mm, see opposite draft.
6. Check flange gasket and replace, if necessary.
7. Tighten the tightening screws of combustion chamber
supports.
8. Remount all trim panels.
9. Remount waste gas connection duly.
While doing so, check gasket (7) and replace, if
necessary.
10. Re-establish all connections and joints and check
them thoroughly.
11. Put unit into service and check proper function of all
operating modes.
12. Make sure to observe the limit values for waste gas
losses according to the relevant regulations.
Important hint to the revision cover!
à
During assembling take care of uniform tightening of
the fixing nuts the revision cover.
à
Uneven tightening may result in leakages of waste
gas passes!