5. Switch on.
¼
See chapter: "Commissioning procedure", page 28.
6.7
Inspection and maintenance of the solar circuit
6.7.1.
Maintenance operations to be performed
WARNING
Use only the same fluid as for refilling. Do not mix different
fluids.
1. Check the level of the heat transporting fluid. Top up the solar fluid
if necessary.
2. Check the antifreeze protection.
3. Check the pressures of the installation and the expansion vessel.
4. As the heat transporting fluid leaks much more readily than water,
carry out a visual check on the tightness of all fittings and gaskets.
5. Check operation of the installation.
6.7.2.
Adding heat transporting fluid
¼
See solar station installation and service manual.
200...500C-2S
6. Checking and maintenance
21/03/2016 - 7652081-001-02
32
Содержание remasol-2 200C-2S
Страница 39: ...en Appendix Information on the ecodesign and energy labelling directives...
Страница 42: ......
Страница 43: ......