6.6.2.
Remounting the inspection hatches
1. Replace the lip retainer ring unit and place it in the
inspection opening, taking care to position the tab on the lip gasket
outside the domestic hot water calorifier.
2. Replace the sheet gasket.
3. Fit the unit together.
CAUTION
Use a torque wrench.
Torque applied to the anode: 8 N·m.
The flange mounting bolts must not be excessively tight.
Flange
Torque load
Lip gasket
6 N·m +1/-0
Sheet gasket 15 N·m
Approximately 6 N·m is obtained by manipulating the box
spanner with the small lever and 15 N·m by manipulating
it with the large lever.
4. After reassembly, check the watertightness of the lateral flange.
L000389-C
1
6x
2
L000594-A
6. Checking and maintenance
200...500C-2S
31
21/03/2016 - 7652081-001-02
Содержание remasol-2 200C-2S
Страница 39: ...en Appendix Information on the ecodesign and energy labelling directives...
Страница 42: ......
Страница 43: ......