background image

The wheels are designed for transport purposes only and not for use when the 
boiler is in its final position. If required for internal transport, the boiler can be 
dismantled into smaller parts for transport. The boiler can be stripped of:

  casing components

  gas/air components

  the frame section on the instrument panel side.

GAS 310/610 ECO PRO

BOILER TYPE

A (MM)

310-285/610-570

723

310-355/610-710

723

310-430/610-860

723

310-500/610-1000

1032

310-575/610-1150

1032

310-650/610-1300

1032

GAS 310/610 ECO PRO

BOILER TYPE

L (MM)

310-285/610-570

1160

310-430/610-710

1160

310-430/610-860

1160

310-500/610-1000

1469

310-575/610-1150

1469

310-650/610-1300

1469

GAS 310/610 

ECO PRO 

DIMENSIONS 

55

See the diagram and table for the 
dimensions of the largest remaining 
transport part, the frame section 
with heat exchanger and water 
connections. For information on 
fitting the parts, refer to the assembly 
instructions delivered with the boiler.

Diagram shows position  
of support feet.

663

21,5

55

55

55

531

87,5

A

67

3

T003474-B

1000

1000

700

1107

T003676-B

55

Содержание GAS 310 ECO PRO

Страница 1: ...GAS 310 610 ECO PRO...

Страница 2: ...ATING PRINCIPLE 08 TECHNICAL INFORMATION 12 ENGINEERING SPECIFICATION 14 BOILER DIMENSIONS 19 SPACE SAVING CONFIGURATIONS 20 MAINTENANCE AREAS 22 TYPICAL INSTALLATION 23 ELECTRICAL CONNECTIONS AND CON...

Страница 3: ...ing gas burner one piece cast aluminium heat exchanger with ultra low NOx emissions Clean trouble free operation and optimum combustion Digital diagnostic display and remote signalling options Easy ma...

Страница 4: ...as pressure measurement point 6 Flue gas thermostat option 19 Inspection hatch 32 Sight glass 7 Condensate collector sealant cap 20 Heat exchanger sensor 33 Flue gas non return valve 8 Pivoting castor...

Страница 5: ...ssure measurement point 6 Flue gas thermostat option 19 Inspection hatch 32 Sight glass 7 Condensate collector sealant cap 20 Heat exchanger sensor 33 Flue gas non return valve 8 Pivoting castor 21 Re...

Страница 6: ......

Страница 7: ...onisation probe which monitors the state of the flame If the flame is unstable or doesn t ignite within the pre set safety time cycle the controls will after five attempts shut the boiler down requiri...

Страница 8: ...ural gas Natural gas Natural gas Natural gas Max gas consumption m3 h 28 1 35 2 42 5 49 6 57 64 6 Min max gas inlet pressure mbar 17 30 17 30 17 100 17 100 17 100 17 30 Gas connection size BSP inches...

Страница 9: ...0 8 GENERAL Dry weight kg 364 398 433 495 531 568 Dimensions WxHxD 1862 x 1500 x 716 1862 x 1500 x 716 1862 x 1500 x 716 2172 x 1500 x 716 2172 x 1500 x 716 2172 x 1500 x 716 NOx Dry 0 0 mg kWh 33 35...

Страница 10: ...inlet pressure mbar 17 30 17 30 17 100 17 100 17 100 17 30 Gas connection size BSP inches 2 x 2 F 2 x 2 F 2 x 2 F 2 x 2 F 2 x 2 F 2 x 2 F Flame protection Ionisation Ionisation Ionisation Ionisation I...

Страница 11: ...water operating pressure bar 7 7 7 7 7 7 Min water operating pressure bar 0 8 0 8 0 8 0 8 0 8 0 8 GENERAL Dry weight kg 707 771 837 957 1025 1095 Dimensions WxHxD 1460 x 1726 x 1862 1460 x 1726 x 1862...

Страница 12: ...An intelligent advanced boiler control shall continuously monitor the boiler conditions varying the heat output to suit the system load The controls shall be able to react to external negative influen...

Страница 13: ...and return and the maximum speed at which the flow temperature increases The boiler will come complete with a pre mix burner NG with the gas air ratio control system controlled internally An intellig...

Страница 14: ...2576 Gas connection G2 Female thread Condensates discharge 32mm Internal Flue gas outlet 250mm Air intake 250mm Second return optional Flange NW 80 Standard DIN 2576 GAS 310 ECO PRO DIMENSIONS Note He...

Страница 15: ...The control panel is on the front as standard but can easily be rotated so that it is on the short side To make the boiler level and to raise the wheels off the floor the adjustment jacks must be used...

Страница 16: ...s connection G2 Female thread Condensates discharge 32mm Internal Flue gas outlet 350mm Air intake 250mm Air supply collector Optional 350mm Second return optional Flange NW 80 Standard DIN 2576 Note...

Страница 17: ...make the boiler level and to raise the wheels off the floor the adjustment bolts must be used Turn the adjustment bolts out as soon as the boiler is placed in the correct position The picture shows th...

Страница 18: ...500 610 1000 1032 310 575 610 1150 1032 310 650 610 1300 1032 GAS 310 610 ECO PRO BOILER TYPE L MM 310 285 610 570 1160 310 430 610 710 1160 310 430 610 860 1160 310 500 610 1000 1469 310 575 610 115...

Страница 19: ...below SPACE SAVING CONFIGURATIONS Indicates spacing required if this is the operating side 19 SPACE SAVING CONFIGURATIONS C 1100 C 600 C 300 300 800 800 720 800 720 800 2540 150 150 150 150 800 720 8...

Страница 20: ...310 ECO PRO MAINTENANCE AREAS Spacing required if this is operating side C 1100 C 600 C 300 300 150 720 800 1670 3190 800 720 150 720 800 C C 600 C 1100 300 300 800 800 C C1 2200 C C1 1200 600 800 80...

Страница 21: ...the air supply filter is used there must be a clearance of at least 65cm A minimum of 30cm is required on the side of the flue gas discharge and a minimum of 30cm is also required on the other side o...

Страница 22: ...rers instructions and must comply with current regulations in force Condensate Condensate Low Temperature Return High Temperature Return Gas Low Temperature Flow High Temperature Flow Control Panel Co...

Страница 23: ...er block temperature sensors The flow temperature can be set between 20 and 90 C The boiler reduces its power when the set outlet temperature is attained The cut out temperature is the set heating out...

Страница 24: ...BR GN 1 2 3 4 5 6 OT bL 1 3 4 RL 5 6 2 X51 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 4 5 6 7 8 9 1 2 3 1 2 3 1 2 3 GN BL BK BL BR BL BK GN SCU 05 X01 X07 X08 X09 X06 X05 X04 X03 X02...

Страница 25: ...xternal gas valve Additional external interlocks by others may be required in a multi boiler installation IMPORTANT This supply cannot be used to control an external gas valve if it supplies other app...

Страница 26: ...ling whilst maintaining design conditions within the building Single and multiple optimising weather compensating boiler controls are available for one or multiple boilers up to a max of eight x Gas 3...

Страница 27: ...ON 0 0 Boiler off 0 5 Blockage 2 0 101 20 100 Heat output supplied CONTROL OF 0 10 V WILO SYSTEM PUMP KEY R Pump speed min Minimum pump speed max Maximum pump speed Off The pump is off U Output signal...

Страница 28: ...n gas exhaust and the air supply opening parallel For the application of air discharge and combustion gas discharge piping with a diameter other than 250mm a reducer should be used L CHIMNEY LENGTH FO...

Страница 29: ...0m 50m 610 1000 8 11m 39m 50m 610 1150 9 5m 26m 50m 610 1300 10 3m 19m 50m PIPE REDUCTIONS PER ELEMENT USED DIAMETER ELBOW 45 ELBOW 90 150mm 1 2m 2 1m 180mm 1 4m 2 5m 200mm 1 6m 2 8m 250mm 2 0m 3 5m 3...

Страница 30: ...10 1150 9 5m 16m 24m 610 1300 10 10m 12m CONNECTION IN AREAS OF DIFFERENT PRESSURE C53 C83 Combustion air supply and combustion gas discharge are possible in various pressure zones semi CLV systems wi...

Страница 31: ...Sub 3 CE Certification Reference number 0085BS0132 NOx Reference Number BS004 ErP Compliant The unit has been inspected for compliance with the essential requirements of the following directives CE i...

Страница 32: ...tered address Baxi Heating UK Ltd Brooks House Coventry Road Warwick CV34 4LL Printed October 2016 Innovation House 3 Oaklands Business Centre Oaklands Park Wokingham RG41 2FD T 0118 978 3434 E info r...

Отзывы: