![Remak DoorMaster C1 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/remak/doormaster-c1/doormaster-c1_installation-and-operating-instructions-manual_1436816005.webp)
5
Air curtains
Installation, mounting
Rules for location - correct installation
Install the curtains above the entrance door with the
outlet slot near the side of the door and with the intake
side in the direction of the room.
Observe the instructions listed in the chapter "Usage
and operating conditions".
Place the curtain with the outlet slot as close as possi-
ble to the wall and as close as possible to the upper
edge of the door opening so that air is prevented from
penetrating through an unwanted gap. The width of the
curtain must correspond at least to the width of the door
opening. A partial overlapping on the sides increases
the efficiency. When designing the hanging, a minimum
of space must be maintained for connecting the media
above the curtain (we recommend at least 150 mm);
easy access to all the service parts of the curtain must
also be ensured - see below and make sure that the
space for intake and exhaust is not restricted by ob-
stacles or other screening. The device must be located
at a safe distance from inflammable materials according
to the appropriate laws.
The curtains are designed for hanging on M8 threaded
bars with the help of hanging profiles (standard equip-
ment of the curtain); as a variation, C1 curtains can be
hung on wall hanging consoles (optional accessory).
Safety instructions
Only professionally trained personnel, who have
been instructed as to the possible dangers regarding
the tasks entrusted to them, may mount the device, put
it into operation and perform maintenance work on it.
When handling, mounting and doing repair and
maintenance work, observe the safety instructions listed
in the appropriate sections of the documentation.
When designing the fastenings for the device and
also when carrying out the actual installation, respect
the weight listed for the product!
The connection of the device must comply with the
appropriate safety norms (before putting into operation,
for example, it is necessary to carry out a final electrical
inspection).
Figure 3
- installation above entrance door
Service procedures
For the location of the curtain, it is important that enou-
gh space is provided for maintenance and service.
Such space depends on the type of curtain, see illus. 4.
Check before mounting
Before the actual mounting, it is necessary to carry out
the following checks:
intactness of the delivery
(its completeness according to the delivery receipt)
parameters of the voltage system and of the connec-
ted power.
The defects ascertained must be eliminated before
mounting begins.
Procedure for mounting the curtains
Mounting on hanging bars and hanging profile on
the upper part of the C1 and D2 curtains
Adjust the length of the threaded bars according
to the height of the hanging.
Affix the M8 hanging bars to the construction
(to the ceiling).
Screw the nuts and washers to the lower end of the
bars in the following order:
M8 nut - 8.4 washer - M8 nut - 8.4 washer - rectangu-
lar binding washer - rectangular binding washer - 8.4
washer - spring washer - M8 nut
Figure 4
- service procedures
Service procedures for the
C1 curtain
removable intake panel
(fuses, terminals for the electri-
cal connection)
Service procedures for the D"
curtain
removable intake panel
(fuses, filtration insert)
service panel (terminals for
the electrical connection)
Figure 5
- hanging profile
hanging bar M8
M8 nut, 8.4 washer
binding washers
M8 nut,
spring washer
hanging profile
Содержание DoorMaster C1
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Air curtains C1 D2 04 2013...
Страница 27: ...27 Air curtains...