Air curtains

Installation, Media Connection

Figure 10 

- mounting on the threaded bars (C1)

Figure 12 

- mounting on the threaded bars (D2)

Figure 11 

- mounting on the hanging console (C1)

  Raise the curtain and slide the hanging profile  

  between the binding washers.

  Tighten the nuts (counter).

  Carry out the connection of the media (see page 11).

  Carry out the connection of the control and main  

  lead-in for the electric power (see page 12).

Hanging on the wall with the help of wall hangers

(the accessory is ordered separately, only C1 curtains) 

The hanging consoles make two kinds of fastening 

possible: above the curtain and on the level of the cu-

rtain. The choice of hanging depends on the particular 

installation.

Dismounting procedure 

  Affix the wall hangings.  Determine the correct positi 

  on of the hangings according to illustration No. 11  

  on page 11.

  Dismount the original hanging profiles from  

  the product.

  Screw in the M8x40 hanging screw with the 8 spring  

  washer and the 8.4 washer halfway into the front 

  nuts on the upper side of the curtain; leave the rear 

  nuts empty.

  Set the curtain (behind the heads of the screws)  

  into the hanger.

  Screw the M8x40 safety screws with the 8 spring  

  washer and the 8.4 washer into the rear nuts.

  Tighten all screws.

  Carry out the connection of the media. 

  Carry out the connection of the control and main  

  lead-in for the electric power (page 12).

Dismounting of the C1 service panels

Dismounting procedure

  Loosen the fast closures located in the openings 

  in the intake panel. Do the loosening with  

  a screwdriver by turning the fast closure 90 degrees 

  to the right - The screw must spring out.

  Open the intake panel and take it off. 

  Unscrew the right lateral protective cover for the  

  wiring (Phillip's head screwdriver):  2x self-cutting  

  screw, 1x M5x10 screw.

Remounting is carried out using the reverse procedure.

Dismounting of the D2 service panels

Dismounting procedure

  Loosen the fast closures located under the intake  

  panel.  Do the loosening with a screwdriver by  

  turning the fast closure 90 degrees to the right -  

  The screw must spring out.

  Open the intake panel and take it off.

  Loosen and open the lower service panel  

  (M6 screws on the lower edge).

Remounting is carried out using the reverse procedure.

Heating Water Piping 

Installation, commissioning and maintenance of the 

device can only be performed by professionally trained 

persons who have been informed on possible dangers 

arising from the assignments which they have been 

authorized to carry out.

The air curtains with water heat exchangers (W) are 

equipped with G 3/4" external thread. Do not use ex-

cessive force when connecting the building's hot water 

circuit to the air curtain. When screwing and tightening, 

the screw connections of the heat exchanger must be 

secured against turning by clamping tools, otherwise 

the heat exchanger piping could be damaged.

Figure 13 

- connection of heating water (flexible pipe)

Содержание DoorMaster C1

Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Air curtains C1 D2 04 2013...

Страница 2: ...exchangers 10 Mounting 11 Electrical connection 12 Putting into operation 13 Mounting of accessories 14 Controllers and room thermostats 16 Connection diagrams 17 Chaining of curtains 22 Operating an...

Страница 3: ...xplosion The version with electric heating and the version without heating can be operated at temperatu res as low as 5 C provided there is no condensation in the environment The version with a water...

Страница 4: ...er electric heater heating output Information and safety plates Plates with the warning sign Attention electric device on the safety covers of the wiring Inlet and outlet for heating water version W P...

Страница 5: ...erve the safety instructions listed in the appropriate sections of the documentation When designing the fastenings for the device and also when carrying out the actual installation respect the weight...

Страница 6: ...the curtains in the C1 series Figure 7 basic dimensions of the curtains in the D2 series Size A ZAV Hanging on hanging profile NKC Hanging on wall console Size A W curtain with water heating E1 E2 cu...

Страница 7: ...c sidewall cover for the wiring Figure 9 basic description of D2 series curtain adjustable outlet screen service panel that can be opened plastic sidewall internal aluminum sidewall removable intake p...

Страница 8: ...7 68 II Step Airflow m h 950 1 400 1 850 850 1 250 1 700 Acoustic pressure dB A 53 55 56 51 53 54 Acoustic output dB A 65 67 68 63 65 66 I Step Airflow m h 800 1 200 1 600 700 1 050 1 450 Acoustic pre...

Страница 9: ...74 76 77 78 73 75 76 77 I Step Airflow m h 1 600 2 400 3 250 4 000 1 600 2 400 3 250 4 000 Acoustic pressure dB A 55 56 58 59 53 55 56 57 Acoustic output dB A 70 72 73 74 69 71 72 73 DoorMaster D2 D2...

Страница 10: ...electric power page 12 Dismounting of the C1 service panels Dismounting procedure Loosen the fast closures located in the openings in the intake panel Do the loosening with a screwdriver by turning th...

Страница 11: ...n are intended for the thermostatic valve connection and are closed with brass plugs refer to the section Accessory Installation on page 14 Wiring It is necessary to ensure safety during this activity...

Страница 12: ...50 Hz power supply system Connect the electric heater to the LE Q1E Q2E Q3E terminals c Door Contact Connection If the door contact is used connect it to the DK1 DK2 terminals These terminals are inte...

Страница 13: ...from the power supply When connecting the valve observe the instructions included in these Installation and Ope rating Instructions Connect the valve Remove the laminated side wall on the header side...

Страница 14: ...tic valve 3 4 with thermostatic regulator and separa te sensor thermo valve accessory Extension 3 4 65mm internal external thread thermo valve accessory Elbow 90 3 4 L 40mm double ended thread thermo...

Страница 15: ...heater to be switched on off Attention To ensure their proper functioning the heater thermo static controllers and room thermostats must be situa ted within the area below the air curtain so they can...

Страница 16: ...r curtain chaining assembly according to the type refer to the Air Curtain Chai ning section page 21 Figure 23 C1 E1 TR air curtains connection X1 Main power connection supply L1 L2 L3 N PE Input volt...

Страница 17: ...at single stage terminals LE Q3E XS Terminals for air curtain chaining assembly according to t the type refer to the Air Curtain Chaining section page 21 Figure 24 C1 E2 air curtains connection Wiring...

Страница 18: ...ion terminals STA21 VVI 46 20 TVW E thermo electric valve Figure 27 W and C1 N TR air curtains connection X1 Main power connection supply L N PE Input voltage terminals DK1 DK2 Door contact connection...

Страница 19: ...ion terminals DK DK Door contact connection terminals XV Fan controller connection terminals Q1 1 Speed stage Q2 2 Speed stage Q3 3 Speed stage the highest speed or two pole switch breaker connection...

Страница 20: ...ng control Possibility for connection of door contact 1 Number of speed steps Three step speed controller 0 1 2 3 Number of heating steps Three step heating controller 0 1 2 3 Room thermostat on off w...

Страница 21: ...e side wall bulging will be left be tween them The electrical interconnection of the connected air curtains is only possible by external cabling Wiring a Fan Control The maximum number of air curtains...

Страница 22: ...of its type designation This version enables direct connection of the subse quent air curtain s electric heater control to the installed terminals XS allowing the switching of chained electric heater...

Страница 23: ...ervice life the user is ob liged to perform regular inspections of the electrical equipment at intervals in accordance with the applicable legal regulations For a list and frequency of regular inspect...

Страница 24: ...ge inspection by an expert Expert Check Expert checking of the device can only be performed by professionally trained persons who have been informed of possible dangers arising from the assignments wh...

Страница 25: ...parts and service materials When disposing of materials it is necessary to observe the applicable local environmental protection and waste disposal re gulations In case of final liquidation of the de...

Страница 26: ...or a part must not be printed or copied without prior written permission from REMAK a s Zubersk 2601 Ro nov pod Radho t m These Installation and Operating Instructions are the sole property of REMAK...

Страница 27: ...27 Air curtains...

Страница 28: ...EMAK a s Zubersk 2601 756 61 Ro nov pod Radho t m tel 420 571 877 878 fax 420 571 877 877 email remak remak cz internet www remak cz V robce si vyhrazuje pr vo zm ny bez p edchoz ho upozorn n R0803110...

Отзывы: