25
Air Handling Units
Vertical Outlet
The roof slope must be interrupted at the outlet opening..
Gas Heating (chimney passage through the roof)
For the flue-gas passage design, refer to figures 20 and 21.
Installation of Covering Roof
a) lower block off-set – lower to upper block off-set of 1 to 2 modules.
b) heat exchanger – the part protruding over the air-handling unit ground contour is covered by a flat roof.
Figure 16
Figure 18
Figure 20
Figure 17
Figure 19
Figure 21