24
Air Handling Units
Installation of Covering Roof
Figure 14
Figure 15
Figure 13
A
h1
(mm)
h2
(mm)
B
(mm)
4M (1386mm)
-
150
677
5M (1692mm)
-
150
830
6M (1998mm)
-
150
983
7M (2304mm)
150
200
757
8M (2610mm)
150
200
859
9M (2916mm)
150
200
961
Horizontally Arranged Units
The roof slope for draining rainwater is created in the same way as with normal sloped roofs.
The roof girders are combined according to the air-handling unit width and the required height (h1/h2) and spacing (B)
Covers for Overlapping Components
Install the covers using 6.5 × 19mm roofing screws with rubber washers.