![ReliOn SS2280 Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/relion/ss2280/ss2280_user-manual_1436465046.webp)
Hardware Operations
1230B0033901
3-7
To install the power distribution board:
Place the power distribution board along the direction of the arrow.
Push it down firmly. Make sure that the power distribution board is connected to the power
supply connector on the power supply.
Figure 3-10 Installing the Power Distribution Board
3.5 Power Supplies
This server is designed with two 700W power supplies. When the server is equipped with
dual power supplies, the hot-swappable redundant function is provided. If one power supply
does not work, you can replace the failed power supply without powering off the server,
because the other one can take the place of the failed one.
The location of the power supplies on the server chassis is shown below:
Figure 3-11 Location of Power Supplies
Reminder
Before you remove or install the power supply, please follow the steps below:
Step 1: Disconnect all necessary cable connections.
Содержание SS2280
Страница 1: ...2U Storage System User Manual SS2280 Jun 2007 Revision C P N 1230B0033901 ...
Страница 26: ...Motherboard Layout Screw Holes Processor System Memory System Configuration Jumper Chapter 2 Motherboard ...
Страница 68: ...Connectors and Pin 1 Locations Cable Connections Power Supply Power On Chapter 4 Cable Connections ...
Страница 82: ...Appendix China RoHS Regulations ...
Страница 83: ...Appendix 1230B0033901 I Appendix China RoHS Regulations Appendix Figure I China RoHS Regulations ...