![ReliOn SS2280 Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/relion/ss2280/ss2280_user-manual_1436465041.webp)
Hardware Operations
1230B0033901
3-2
To press the button:
Press the power button
to toggle the server to hibernation. The power LED
in blue
turns off.
Figure 3-1 Pressing the Power Button
To unplug the power cords:
First unplug the power cords from the AC outlet and then from the server.
Figure 3-2 Unplugging the Power Cords
3.2 Chassis Cover
The server is a 2U form factor designed for easy assembly and disassembly, making the
replacement of internal components very convenient.
Reminder
Before you remove or install the chassis cover, please follow the steps below:
Step 1: Make sure the server is not turned on or connected to the AC power. To power off
the server, see “3.1.1 Power Off”.
Please remove the intruder switch from J17 to allow the system to continue
operating normally when the top cover of the chassis is opened.
Содержание SS2280
Страница 1: ...2U Storage System User Manual SS2280 Jun 2007 Revision C P N 1230B0033901 ...
Страница 26: ...Motherboard Layout Screw Holes Processor System Memory System Configuration Jumper Chapter 2 Motherboard ...
Страница 68: ...Connectors and Pin 1 Locations Cable Connections Power Supply Power On Chapter 4 Cable Connections ...
Страница 82: ...Appendix China RoHS Regulations ...
Страница 83: ...Appendix 1230B0033901 I Appendix China RoHS Regulations Appendix Figure I China RoHS Regulations ...