Page 38
Figure 30 Valve clearance - tappet
adjustment
1.
Feeler gauge
2.
Adjusting screw
3.
Lock nut
15.
Refit front engine plate with a new gasket, to the engine
block and secure with three nuts and washers.
16.
Fit the crankshaft outer thrust washers with the oil slots
facing forward, followed by the steel thrust washer with its
countersunk aperture facing rearwards.
17
.
Fit the woodruff key, spacer and crankshaft sprocket.
18.
Using the flywheel, turn the crankshaft until the woodruff
key is pointing to 11 o'clock.
19.
Turn the camshaft until the groove in the end of the
camshaft is in alignment with the woodruff key on the crankshaft.
20.
Replace the camshaft sprocket along with the timing chain
and secure with two bolts and new locking plate.
21.
Using a straight edge, check the camshaft sprocket is in
alignment with the camshaft sprocket. The valve timing mark on the
camshaft sprocket should now be pointing to the woodruff key on the
crankshaft.
22.
Check timing chain tensioner for wear, renew if worn, and
position on the post in the timing cover.
23.
Fit the timing chain cover with a new gasket, using
centralising tool No. RT 7481, and secure with seven bolts, two nuts
and lock washers (
Figure 12
).
24.
Replace crankshaft pulley and secure with bolt, plain
washer and lock washer.
25.
Locate a new gasket and fit the oil pump assembly,
complete with strainer, securing to the cylinder block with two nuts
and lock washers. Refit oil pump and distributor drive shaft.
26.
Fit a new gasket and then fit the sump pan, tightening the
fifteen set screws and spacers evenly.
27.
Clean the cylinder head and cylinder block faces and fit a
new gasket. Smear grease around the metal edges of the gasket bore
eyelets.
28.
Carefully position the cylinder head squarely on the cylinder
block and secure with twelve nuts and washers. Replace the three
bolts on the sparking plug side of the cylinder head.
Figure 31 Tappet adjustment tool
Figure 32 Stud removal tool
Check that the cylinder head nuts indicated in Figure 14 are tightened
progressively to a torque of 3.46 kg/m (25 lb/ft). The three smaller
nuts should be tightened to 2.07 kg/m (15 lb/ft).
29.
Replace the push rods ensuring they are positioned in the
correct order.
30.
Install the rocker shaft on the four studs and secure firmly
with four nuts and washers to a torque of 2.35 to 3.04 kg/m (17 to 22
lb/ft) Check tappet clearance (see Operation 17).
31.
Fit a new gasket and refit the rocker cover.
32.
Refit all ancillaries.
33.
Install the engine and gearbox assembly (see
Operation 1
).
Содержание Rebel 700 1967
Страница 8: ...Page 8 Section A Chassis Frame ...
Страница 9: ...Page 9 ...
Страница 14: ...Page 14 ...
Страница 19: ...Page 19 ...
Страница 24: ...Page 24 Section F Engine ...
Страница 41: ...Page 41 Section G Early Models prior to Chassis No 941001 3 Synchro Gearbox ...
Страница 43: ...Page 43 ...
Страница 47: ...Page 47 ...
Страница 52: ...Page 52 ...
Страница 55: ...Page 55 ...
Страница 57: ...Page 57 Section K Rear Axle ...
Страница 68: ...Page 68 ...
Страница 72: ...Page 72 Section P Fuel System ...
Страница 75: ...Page 75 ...
Страница 84: ...Page 84 ...
Страница 85: ...Page 85 ...
Страница 89: ...Page 89 Section R Interior ...
Страница 94: ...Page 94 ...
Страница 95: ...Page 95 ...
Страница 105: ...Page 105 ...
Страница 107: ...Page 107 ...
Страница 109: ...Page 109 ...
Страница 110: ...Page 110 ...
Страница 112: ...Page 112 ...
Страница 113: ...Page 113 ...