Listing and Approval Agencies
See the Available Configurations, Listings, and Approvals table in this Bulletin for listings and approvals applicable to each
available configuration.
1.
Listed by Underwriters Laboratories, Inc. and UL Certified for Canada (cULus)
2.
Certified by FM Approvals (FM)
3.
Permitted in New York City based on UL Listing per Local Law 33/2007 (NYC)
Technical Data
Nominal K-Factor: 5.6 gpm/psi
1/2
(80 L/min/bar
1/2
)
Sprinkler
Listing or Approval
Deflector to Ceiling Distance
Maximum Working Pressure
F3QR56 Dry
Pendent
cULus, NYC
See note below
250 psi (17.2 bar)
FM
See note below
175 psi (12 bar)
F3QR56 Dry
Horizontal Sidewall
cULus, NYC
4” to 6 “
250 psi (17.2 bar)
4” to 12”
175 psi (12 bar)
FM
See note below
175 psi (12 bar)
F3QR56 Dry Upright
cULus
See note below
175 psi (12 bar)
Note:
Deflector distance to be in accordance with applicable NFPA, FM, or other agency requirements. Information is provided
only when additional clarification is necessary.
Temperature
Classification
Glass Bulb Color
Sprinkler
Temperature Rating
Cover Plate
Temperature Rating
Maximum Ceiling
Temperature
Listings and
Approvals
(1)
Ordinary
Orange
135°F (57°C)
135°F (57°C)
100°F (38°C)
cULus, FM, NYC
Red
155°F (68°C)
Intermediate
Yellow
175°F (79°C)
165°F (74°C)
150°F (66°C)
cULus, NYC
Intermediate
Green
200°F (93°C)
165°F (74°C)
150°F (66°C)
cULus, FM, NYC
High
Blue
286°F (141°C)
None
225°F (107°C)
cULus, FM
(2)
, NYC
165°F (74°C)
150°F (66°C)
cULus, NYC
(1)
For listed and approved sprinkler, escutcheon, and inlet configurations see the Available Configurations, Listings, and Approvals table in this Bulletin.
(2)
High temperature classification is FM Approved with Standard and Model HB escutcheons only.
3.
Finish Notes
1. Finishes vary with type of trim selected. See table provided with each sprinkler detail for finish combinations.
2. Paint or any other coating applied over the factory finish will void all approvals and warranties.
3. Other finishes and colors may be available on special order. Consult your Reliable sales representative for details.
4. For Standard, Model HB, and Model F1 trims, both components of escutcheon are finished.
5. For Model FP and CCP trims, only the trim ring and cover plate are finished. The threaded sprinkler cup is unfinished.
Содержание F3QR56
Страница 14: ...Fig 11 14...
Страница 15: ...Fig 12 15...
Страница 16: ...Fig 14 Model XLO2 Wrench Fig 13 Model F3R Wrench 16...
Страница 17: ...Fig 15 17...