THERMOJET
®
H-2000E SERIES
OIL PURIFIER SYSTEM
INSTALLATION AND OPERATING MANUAL
Doc #
77740121
Rev
15
Date
June 2020
Page
59
of
102
Once inspection and cleaning is complete reinstall the tube fitting with drain orifice and the drain
tubing from the bottom of the heart tube and the jet mixer
With a new flange gasket, use the flange studs and nuts to install the heater bundle into the
heater vessel. Gasket p/n 40500060
Reinstall and align the conduit and tighten the conduit union to secure the conduit to the heater
terminal enclosures. Connect the power wiring to the heater terminals. Reinstall terminal cover.
Install the cap on the drain valve in the bottom of the heater vessel and insure that the drain valve
is in the close position.
Take care to guard against pinching and crushing
hazards when handling the heater bundle.
NOTICE:
All electrical connections should only be made by a qualified
personnel
.
Ensure that all enclosure covers are securely
installed.
WARNING
WARNING
Use suitable transport equipment for removing the
heater bundle from the heater vessel, lifting and
re-installing the heater into the heater vessel.
Ensure that the heater is secured prior to and
during lifting and transport. Stand clear of the all
equipment while being maneuvered. Crane and
fork truck operators should be properly trained in
there operation.
Heater approximate weight is 84 Kg (185 pounds)