background image

Dimensions

           

Radius | Position A

           

Radius | Position B

       

   Height of Lift | Position A

           

Height of Lift | Position B

           

Height of Pin Position 1

           

Height of Pin Position 2

           

A

P1

P2

B

C

D

T

DAVIT

D

C

B

A

P1

P2

Type S

Position A

Position B

Содержание T DAVIT

Страница 1: ...US REIDLIFTING COM Assembly Operation Guide TDAVIT...

Страница 2: ...ections Maintenance Repair Storage Transportation Sockets Socket Installation Minimum Mounting Requirements Verifying the Installation ATEX 12 ATEX Classification Zone 2 Classification Zone 1 Spark Fo...

Страница 3: ...apply for Operation including preparation troubleshooting during operation and cleaning Maintenance inspection and repair Transportation It is the responsibility of the end user to adhere to the Healt...

Страница 4: ...city indicated on the product Personnel Lifting When lifting people the overall load limit is reduced by half to provide an increased safety factor The maximum capacity permitted by the personnel winc...

Страница 5: ...ecommend that gloves are worn when using the equipment Attach the hoist to the dedicated lifting point only making sure it is attached in a way that does not expose the user to danger by the hoist cha...

Страница 6: ...uch as trapping fingers in rotating parts Be aware of any adverse weather conditions such as strong or gusty winds which could impose additional horizontal loads and affect the stability of the struct...

Страница 7: ...on climatic exposure on the fall protection lifelines and the effect of offset forces as a result of pendulum falls Where regulations require each installation must be approved by a qualified person W...

Страница 8: ...sh with the top of the socket Regular Inspections To ensure that the product s remains in safe working order it must be inspected regularly by a competent person We recommend inspections every 6 month...

Страница 9: ...equipment in a clean and dry manner Cleaning is suggested using a sponge or cloth with warm soapy water rinsing and allowing to dry This product must be assembled using metric fixings of the same typ...

Страница 10: ...into new concrete or resin bonded into existing concrete Socket Installation Socket installation should only be carried out by a qualified person with the ability to specify the anchors resin and fas...

Страница 11: ...n verifying the installation testing should be to no more than 125 of the goods capacity at its maximum reach All tests should be carried out in all anticipated worst case loading directions sustained...

Страница 12: ...ures are unlikely to occur or if they do occur are likely to do so only infrequently and for a short period only The product will have the following identification on the serial label As Standard for...

Страница 13: ...hing cable should be used Inspection Maintenance Repair Special attention should be given to dust deposits on the structure especially in areas where the profiles come into contact and should be wiped...

Страница 14: ...Top Mount Side Mount Bridge Mount Cast In or Resin Bonded depending on application The T DAVIT shown is a winched version but an unwinched variant is also available Appropriate PPE should be worn Glo...

Страница 15: ...p Present the beam to the chosen location and insert the clevis pin The T DAVIT beam can be assembled at 2 positions as shown Ensure the correct set up is chosen at this stage 15 TDAVIT Assembling the...

Страница 16: ...ert the clevis pin to take the weight of the beam Secure the pin with the R clip For disassembly reverse steps 1 9 In some circumstances the winch can be used to rotate the beam in line for the pin in...

Страница 17: ...17 TDAVIT Variants Options Type VW...

Страница 18: ...ay vary between a Top Mount Side Mount Bridge Mount Cast In or Resin Bonded depending on application Appropriate PPE should be worn Gloves Protective Footwear Hard Hat Assembly Instructions Socket Top...

Страница 19: ...vent the beam from disengaging Place the winch and bracket in position Place winch attachment column to the beam as shown Secure attachment with the nuts and bolts supplied 19 TDAVIT Assembling the T...

Страница 20: ...lied Thread the rope over the sheaves The rope retaining pins need to be removed before fitting the rope Reinsert pins ensuring they are secure Please refer to the Operating manual of the winch before...

Страница 21: ...21 TDAVIT Variants Options Type T...

Страница 22: ...extension is optional and the socket type may vary between a Top Mount Side Mount Bridge Mount Cast In or Resin Bonded depending on application Appropriate PPE should be worn Gloves Protective Footwe...

Страница 23: ...Reinsert bolt and spacer ensuring they are secure Insert T Davit column into the socket Thread beam trolley over the end of the beam Lock trolley with friction brake at approximately centre position 2...

Страница 24: ...e pin with retaining R clip The T Davit is now erect Rotate the beam as illustrated Insert rear clevis pin Present the beam to the column and insert clevis pin to take the weight of the beam Assembly...

Страница 25: ...Release trolley brake Use the hand chain to move the trolley along the beam 25 TDAVIT 12 13...

Страница 26: ...Variants Options...

Страница 27: ...e configuration users can experience a maximum effort of 78lb The rotation should be done in a controlled manner When the rotational handle is attached to the Davit the following points must be observ...

Страница 28: ...n A Height of Lift Position B Winch Position 1 Winch Position 2 Winch Position 3 Winch Position 4 Winch Position 5 Height of Pin Position 1 Height of Pin Position 2 A W1 W2 W3 W4 P1 W5 P2 B C D TDAVIT...

Страница 29: ...D C D Weight lbs Winch Position P1 P2 3 52 64 52 67 N A N A 51 W1 7 58 61 W2 12 W3 24 W4 29 W5 34 4 N A N A 64 80 64 86 55 W3 24 70 74 W4 29 W5 34 Beam Option 1 2 3 BEAM LENGTH 57 65 80 DIMENSION A B...

Страница 30: ...ions Radius Position A Radius Position B Height of Lift Position A Height of Lift Position B Height of Pin Position 1 Height of Pin Position 2 A P1 P2 B C D TDAVIT D C B A P1 P2 Type S Position A Posi...

Страница 31: ...7 N A N A 51 W1 7 58 61 W2 12 W3 24 W4 29 W5 34 4 N A N A 64 80 64 86 55 W3 24 70 74 W4 29 W5 34 Beam Option 1 2 3 BEAM LENGTH 57 65 80 DIMENSION A B A B A B REACH 33 30 41 37 57 52 LOAD RATING lbs 11...

Страница 32: ...nt environmental issues and the health and safety practices within the company ISO 9001 2015 Quality management system which assesses an organization s ability to consistently provide products that me...

Страница 33: ...ile review are integral parts of our design and manufacturing process External verification of products is undertaken where appropriate using government approved Notified Bodies All products have been...

Страница 34: ...Product Labelling Product labelling The following labels must be present on the product and must be legible lbs 1 2 3 4 6 3 3 4 6 5 1 2 5 2 1...

Страница 35: ...rial number The goods capacity WLL of the device The year of manufacture The standards to which the device is approved The ATEX rating of the product if applicable CE Marking Minimum braking load MBL...

Страница 36: ...com Printed using environment friendly processes and materials All information herein is copyright protected by REID Lifting Ltd All company and product names are Trade Mark and Trade Name protected a...

Отзывы: