Attach the lifting device to the trolley in
order to avoid having to lift and attach
when gantry is fully erect.
With the help of 2 (or 3) people, scissor
the beam and A-Frame into position
(using the first bolt as a hinge until
A-frame assembly perpendicular to beam)
Repeat the scissor activity at the opposite
end of the gantry - Steps 16-18
Tighten all bolts to 27 Nm (20 ft lbs) or until spring
washers are fully depressed.
If raising the beam height – leave the two height
adjustment bolts loose on each upright. –see next
section.
Decide on the height required (always using the
lowest setting for the work in hand).
21
If mechanical aid assembly not possible proceed
as follows:
Secure trolley at opposite end of beam to be
assembled and secure by tightening the trolley
knob
Move trolley to other end of beam, opposite to
the end to be raised, and secure by tightening
the trolley knob
Be careful not to trap any fingers in this operation.
The use of a suitable platform ladder
may be required to reach the bolt-hole.
Insert the second bolt into the cheek-plate.
Tighten both bolts until spring washer is fully
depressed, be cautious not to overtighten
For additional safety, a spare bolt can be
temporarily placed in the adjustment point.
Insert and tighten the final beam bolt
Assembly Instructions
Manual Assembly
Release trolley and castor brakes to position the
gantry over the load, ensuring if possible that the
load is lifted from the center of the beam
Ensure the beam is horizontal and
castors are locked prior to any lift.
The use of a suitable platform ladder may be required.
If the hoist is not already attached to the
suspension point on the trolley, do so now
The gantry is now erect at its lowest height setting.
PORTA
GANTRY
11000
16
16a
18a
17
18
19
21
20
21
21a