
35
rautool G1/H/G1
maintenance notes
To top up oil lay unit on its side
and open oil filler screw.
To vent the system stand pump
unit upright and lower down
clamping tool; operate tool
several times without building up
pressure.
The correct oil level is to the
middle of the display glass when
pump unit is standing upright...
To vent the system stand foot
pump upright and lower down
clamp ing tool; operate tool
several times without building up
pressure.
... or on its side (oil filler screw
facing upwards). Do not overfill
with oil.
Clean and dry tool before storing it away!