Mansfield L850B ST Woodfire
17
installation
8. DETERMINE THE THICKNESS OF THE FINISHING MATERIAL.
INSTALLATION INSTRUCTIONS
UNIT PREPARATION/FRAMING/CLEAN EDGE
9. You are now ready to install the flueing.
Please refer to Flue requirements in this manual then install your flue system.
10. After the flue has been installed, complete the install of your optional kits
such as fan and/or outside air kit
When cutting a rectangular opening in the finishing
material to fit around the clean edge :-
Width
The width of the opening must include the actual width of the clean edge
finish (outside edge to outside edge) plus allow for the 20 mm stand-offs on
the left & right sides
Height
The height of the opening must include the actual height of the clean edge
finish (outside edge to outside edge) plus allow for the 20 mm stand-offs on
the top edge plus a 5 mm air gap along the bottom edge
The actual position of the opening in the facing material will depend on site
conditions, finished floor level, the height of the zero clearance box off finished
floor level, etc. We suggest, to avoid errors, that these measurements be taken
when the heater is actually installed in its final location.
Содержание MANSFIELD L850B ST
Страница 38: ......
Страница 39: ...Mansfield L850B ST Woodfire 39 notes ...