L390E-2 / HZI390E-2 Direct Vent Gas Insert
5
5
TABLE OF CONTENTS
Heat exchange return ..................................................34
Brick panel installation .................................................35
Enamel panel installation.............................................36
Glass door removal / installation .................................37
3 sided low profi le faceplate installation ......................38
4 sided low profi le faceplate installation ......................39
Oversize faceplate installation .....................................40
Optional Hearth Trim installation .................................41
Optional screen installation .........................................42
Optional full screen door installation............................43
OPERATING INSTRUCTIONS
Operating Instructions ................................................44
Lighting Procedure ......................................................44
ShutdownProcedure ....................................................44
First Fire ......................................................................44
Automatic Convection Fan Operation.........................44
Normal Operating Sounds Of
Gas Appliances............................................................45
Copy Of Lighting Instruction Plate ...............................45
Maintenance Instructions............................................46
Door Glass ..................................................................46
Pilot Adjustment ...........................................................47
General Vent
MAINTENANCE
Maintenance ................................................................47
Log Replacement ........................................................47
Glass Gasket ...............................................................47
Glass crystal burner removal / installation - Hzi390eb 48
Glass Burner Removal ................................................48
Glass Burner install .....................................................48
l390E /l390eb ceramic burner Removal / installation .49
Fan maintenance - with GTMF remote control ............50
for L390Eb or Hzi390eb...............................................50
valve replacement .......................................................51
PARTS LIST
Main Assembly ............................................................53
low profi le faceplate ....................................................55
WARRANTY
Warranty ......................................................................55
DIMENSIONS
Unit dimensions .............................................................3
SAFETY LABEL
Copy of the Safety Label ...............................................5
REQUIREMENTS
MA Code - CO Detector.................................................8
INSTALLATION
Important Message ......................................................9
Before You Start ............................................................9
Important Message ....................................................10
For Your Safety ............................................................10
Specifi cations ..............................................................10
Gas Pressure Testing ..................................................10
Installation Into A Solid Fuel Burning Fireplace Or
Factory Built Fireplace .................................................10
Before You Start ..........................................................10
Installation Checklist .................................................... 11
Materials Required ...................................................... 11
Minimum Fireplace Dimensions .................................. 11
Minimum Clearances to combustibles .........................12
Gas Connection ...........................................................13
Venting.........................................................................13
Flue / vent installation ..................................................14
Levelling leg adjustment ..............................................15
Air shutter Adjustment .................................................16
Conversion from NG to LP ........................................17
High Elevation .............................................................19
Gas Line Installation ....................................................19
Gas Pipe Pressure Testing ..........................................19
885 S.I.T. Valve Description .........................................19
Fan installation / removal.............................................20
Wiring Diagram ............................................................22
Profl ame Remote system gtm (L390E / HZI390E) ......22
AC power adaptor installation (for surefi re systems) ...23
Profl ame remote system GTMF with fan (L390EB /
HZI390EB) ...................................................................24
Fan Wiring Diagram ....................................................25
Optional wall thermostat installation ............................26
Glass crystal / ceramic spa stone installation ..............27
Optional Pebbles / GLASS crystal Installation for Fire-
box Base (AROUND BURNER) ..................................27
HZI390E optional log set installation ...........................29
L390E log set installation ...........................................31
Standing pilot ..............................................................34