City Series CV60E-1 |
81
installation
03.09.20
920-222
1
CITY SERIES
EXTENDED VIEW PANEL INSTALLATION
2. Locate mounting holes in locations shown below and remove nailing
strips (if already installed).
4. Move unit into framed opening at desired height and level unit on
all sides. Connect gas and electrical (see manual).
5. Install a second stud as shown. The distance from first to second
stud should be 8-1/2"
installation
919-809
07.05.17
1.
Construct the sealed rear enclosure to specified width shown below
and desired height (see unit manual for detailed framing instructions).
2.
Locate mounting holes in locations shown below and remove nailing
strips (if already installed).
3.
Attach left and right base panels using 2 screws on each side. Re-
move drywall finishing edge from right and left side of window open-
ing using supplied right-angle screwdriver.
4.
Move unit into framed opening at desired height and level unit on all
sides. Connect gas and electrical (see manual).
EXTENDED VIEW PANEL INSTALLATION
Mounting
holes
Enclosure
width:
CV40E - 46-3/4"
CV60E - 65-11/16"
CV72E - 78"
Attach base panels
Install second stud--8.5" out from first stud
8.5" from stud center to
stud center
Secure base panels
5.
Install a second stud as shown. The distance from first to second
stud should be 8-1/2".
6.
Secure base panels in place with 5 screws on each side.
8-1/2"
1
CITY SERIES
Extended View Panel Installation
installation
919-809
07.05.17
1.
Construct the sealed rear enclosure to specified width shown below
and desired height (see unit manual for detailed framing instructions).
2.
Locate mounting holes in locations shown below and remove nailing
strips (if already installed).
3.
Attach left and right base panels using 2 screws on each side. Re-
move drywall finishing edge from right and left side of window open-
ing using supplied right-angle screwdriver.
4.
Move unit into framed opening at desired height and level unit on all
sides. Connect gas and electrical (see manual).
EXTENDED VIEW PANEL INSTALLATION
Mounting
holes
Enclosure
width:
CV40E - 46-3/4"
CV60E - 65-11/16"
CV72E - 78"
Attach base panels
Install second stud--8.5" out from first stud
8.5" from stud center to
stud center
Secure base panels
5.
Install a second stud as shown. The distance from first to second
stud should be 8-1/2".
6.
Secure base panels in place with 5 screws on each side.
8-1/2"
1
CITY SERIES
Extended View Panel Installation
1. Construct the sealed rear enclosure to specified width shown below
and desired height (see unit manual for detailed framing instructions).
installation
919-809
07.05.17
1.
Construct the sealed rear enclosure to specified width shown below
and desired height (see unit manual for detailed framing instructions).
2.
Locate mounting holes in locations shown below and remove nailing
strips (if already installed).
3.
Attach left and right base panels using 2 screws on each side. Re-
move drywall finishing edge from right and left side of window open-
ing using supplied right-angle screwdriver.
4.
Move unit into framed opening at desired height and level unit on all
sides. Connect gas and electrical (see manual).
EXTENDED VIEW PANEL INSTALLATION
Mounting
holes
Enclosure
width:
CV40E - 46-3/4"
CV60E - 65-11/16"
CV72E - 78"
Attach base panels
Install second stud--8.5" out from first stud
8.5" from stud center to
stud center
Secure base panels
5.
Install a second stud as shown. The distance from first to second
stud should be 8-1/2".
6.
Secure base panels in place with 5 screws on each side.
8-1/2"
1
CITY SERIES
Extended View Panel Installation
3. Attach left and right base panels using 2 screws on each side.
Remove drywall finishing edge from right and left sides of window
opening using supplied right-angle screwdriver.
installation
919-809
07.05.17
1.
Construct the sealed rear enclosure to specified width shown below
and desired height (see unit manual for detailed framing instructions).
2.
Locate mounting holes in locations shown below and remove nailing
strips (if already installed).
3.
Attach left and right base panels using 2 screws on each side. Re-
move drywall finishing edge from right and left side of window open-
ing using supplied right-angle screwdriver.
4.
Move unit into framed opening at desired height and level unit on all
sides. Connect gas and electrical (see manual).
EXTENDED VIEW PANEL INSTALLATION
Mounting
holes
Enclosure
width:
CV40E - 46-3/4"
CV60E - 65-11/16"
CV72E - 78"
Attach base panels
Install second stud--8.5" out from first stud
8.5" from stud center to
stud center
Secure base panels
5.
Install a second stud as shown. The distance from first to second
stud should be 8-1/2".
6.
Secure base panels in place with 5 screws on each side.
8-1/2"
1
CITY SERIES
Extended View Panel Installation
Install second stud--8.5" out from first stud
8.5" from stud center to
stud center
8-1/2"
Secure base panels
6. Secure base panels in place with 5 screws on each side.
Extended View Panel Installation
Содержание City CV60E-1
Страница 22: ...owner s information 22 City Series CV60E 1 Glass Barrier Removal Glass barrier removal video ...
Страница 98: ...parts list 98 City Series CV60E 1 Main Assembly ...
Страница 106: ...warranty 106 City Series CV60E 1 ...
Страница 107: ......