City Series CB60E
|
31
installation
Clearances
Floor to ceiling with top opening
Full framing with vents in front/
2
sides or top
Full framing with low vents in front or
2
sides
Full framing with vents in front or
2
sides
C
I
A1
A
D
L
J
H
L
I
C
D
A1
A
J
G
G
H
H
H
I
C
G
A
A1
G
D
J
L
H
H
I
A
D
C
J
G
G
L
H
H
A
1
opening
opening
opening
opening
Содержание 686-927
Страница 48: ...48 City Series CB60E installation 2 x 4 shown Max 2 x 6 Typical Installations Flush Install Recessed Install ...
Страница 104: ...104 City Series CB60E warranty ...
Страница 105: ......
Страница 106: ...106 City Series CB60E notes ...
Страница 107: ...City Series CB60E 107 notes ...