background image

6    |  GF40-2 Pellet Stove

THROUGH WALL VERTICAL RISE HORIZONTAL TERMINATION INSTALLATION - FREESTAND-

ING

A termination cap is always recommended for this type of install but a stainless steel termination hood or a 45° elbow may be used in place of 

the cap.
Figure 1 is the recommended installation set up, venting length is negligible.
Figure 2 is the installation to use if there is a concrete or retaining wall in line with exhaust vent on a pellet stove. The termination must be 12” 

(30 cm) from the outside wall and 12” (30 cm) above the ground. 

Figure 1 - Venting Horizontally with Rise 

Figure 2 - Venting with Concrete Wall Behind Unit

Wall framing

Wall thimble

Termination cap

Vertical section of vent pipe

Horizontal frame for thimble

Clean out tee

90° elbow

Wall strap

Wall framing

Wall thimble

Termination cap

Vertical section 

of vent pipe

Horizontal frame 

for thimble

90° elbow

Concrete Wall

Clean out tee

Содержание Greenfire GF40-2

Страница 1: ...mption will vary with the type of fuel used Model GF40 2 Heat Output BTUs 6 881 23 892 BTUs Emissions grams hr EPA Certified 0 54 grams hr Efficiency EPA HHV 80 2 Efficiency EPA LHV 87 4 Flue Size 3 7...

Страница 2: ...se dimensions are minimum clearances but it is recommended that you ensure sufficient room for servicing routine cleaning and maintenance A Side wall to unit 8 inches 200 mm B Back wall to unit 5 5 in...

Страница 3: ...ond the control of FPI we grant no guarantee against such incidents NOTE Venting terminals shall not be recessed into walls or siding Letter Minimum Clearance Description A 24 in 61 cm Above grass top...

Страница 4: ...eople sleep in Outside fresh air is mandatory Secure outside air connections directly to fresh air intake pipe and secure with three screws evenly spaced CAUTION THE STRUCTURAL INTEGRITY OF THE MANUFA...

Страница 5: ...ble with high temperature silicone 9 The pipe must extend at least 12 30 cm away from the building If necessary bring another length of pipe PL type to the outside of the home to connect to the first...

Страница 6: ...allation to use if there is a concrete or retaining wall in line with exhaust vent on a pellet stove The termination must be 12 30 cm from the outside wall and 12 30 cm above the ground Figure 1 Venti...

Страница 7: ...apor barrier 6 Finally extend the pellet vent to go through the roof flashing 7 Ensure that the rain cap is approximately 24 600 mm above the roof 1 Install a tee with clean out on the outside of the...

Страница 8: ...e chimney Freestanding Hearth Mount Installation Combustible Floor Masonry Fireplace Rain Cap Steel Plate or Flashing Flexible or Rigid 6 Stainless Steel Liner 10 25 4 cm Mantel Minimum 8 20 cm from t...

Отзывы: