Fig. 13: Grid-connected PV system with photovoltaic inverter
3.8 Requirements for the Infrastructure
The following points are to be considered when
planning the infrastructure:
∘
The
REFUsol 100K
can feed into the low-voltage grid
and the medium-voltage grid.
∘
The power supply line must be equipped with an ap
-
propriate AC disconnecting device.
∘
The
REFUsol 100K
is not equipped with internal po
-
tential isolation.
∘
If connected with the medium-voltage-grid, it must
be operated with electrically isolating transfor
-
mers.
∘
The transfomer must be selected according to the
specific site of use and the relevant regulations
must be taken into account: Hazardous substances
1
Photovoltaik (PV) modules
2
Solar string combiner box
3
Photovoltaic inverter
4
AC protection (fuse switch disconnector or circuit breaker)
5
Grid protection
6
Isolation transformer is required for medium-voltage grid
7
Low or medium-voltage AC grid
Additional required
equipment
at low voltage
network
at medium vol
-
tage network
DC load break switch integrated
1)
integrated
1)
AC load break switch necessary
necessary
Central grid protecti
-
on device with section
switch
(VDE-AR-N 4105,
VDE-AR-N 4110)
necessary
necessary
LV-/MV-Transformer not necessary
necessary
1)
Local regulation might require an additional DC switch at a external DC
combiner box.