Reflex Fillcontrol Auto Скачать руководство пользователя страница 11

 

Operation 

 

 

 

Fillcontrol Auto 

 22.09.2020 - Rev. C 

 

English  

 11 

 

Proceed as follows: 
1. 

Press "Manual" on the controller's operator panel. 

  

"PU" flashes on the display to visually indicate that the pump has 
been selected for the "Levelcontrol' make-up variant. 

  

Use the arrow keys at the operator panel to select "PU" on the 
display. 

   "PU" flashes on the display to visually indicate that the 

pump has been selected for the "Magcontrol' make-up variant. 

2. 

Press "OK" on the controller's operator panel. 

  

The pump is switched on and the displays shows "PU!". 

  

The display must show values of ≥

 5 bar for the pressure for the 

activated pump. 

3. 

Press "OK" on the controller's operator panel. 

  

The pump is switched off and the displays shows "PU". 

 

The function test for the pump is completed. Slowly open the "BV" shut-off valve 
in the pressure line from the pump to the system circuit. 

 



Note! 
If the pressure does not rise when the pump is activated: 

 

Shut down the pump. 

 

Vent the pump, see chapter 7.3 "Filling the device with water" o
page 9 . 

 



Note! 
Execute a function test of the system separator tank according to the 
user-supplied specifications. 

 

7.7

 

Use the device to fill the facility system with water 

You have the option to use the device to fill the system circuit with water. These 
requirements must be met for the filling with water: 

 

The system circuit has not been previously filled with water. 

 

The system circuit has a maximum water volume up to 3,000 litres. 

 

It is a system circuit with a diaphragm expansion system. 

 

Set the following operating modes at the controller: 

 

"Magcontrol" make-up, see chapter 9.2.1 "Customer menu" on page 13 . 

 

Manual operation, see chapter 8.1.2 "Manual mode" on page 11 . 

 

Proceed as follows: 
1. 

Press "Manual" on the controller's operator panel. 

2. 

Use the arrow keys at the operator 
panel to select "Fill" on the display.  

10 h 

 

2.0 bar 

PU! 

Filling 

 

 

  

"Fill" flashes on the display to visually indicate the selection. 

3. 

Press "OK" on the controller's operator panel. 

  

The pump is switched on and the displays shows "Fill!". 

 

The controller calculates the required filling pressure. As soon as this 
value has been attained, the controller automatically stops the filling 
process. 

 

The system circuit is filled with water. 

 



Note! 
Monitor the system for the entire automatic filling process. 

 



Note! 
If the maximum filling time (10 hours by default) is exceeded, the 
system aborts the make-up process with an error message. 

 

After the cause has been found, acknowledge the error message 
by pressing "Quit" at the controller's operating panel and 
continue with the filling process, see chapter 9.3 "Messages" o
page 14 . 

 

7.8

 

Starting Automatic mode 

Automatic operation can be started after initial commissioning. The following 
prerequisites must be met for automatic operation: 

 

"P

0

" minimum working pressure is entered in the controller. 

 

The device is filled with water. 

 

All required parameters are defined in the controller. 

 

The function test has been concluded. 

 

Start the automatic mode at the operator panel of the controller: 

 

Press "Auto" for automatic operation. 

 

The "Auto" LED at the operator panel illuminates to visually signal 
automatic operation. 

 



Note! 
The commissioning process is now concluded. 

 

8

 

Operation 

8.1

 

Operating modes 

8.1.1

 

Automatic mode 

Use: 
After initial commissioning has been successfully completed 

 

Start: 
Press "Auto" on the controller. The Auto LED lights up. 

 

Functions: 
Automatic operation is suitable for continuous operation of the device.  
The controller monitors the make-up functions.  
 
8.1.2

 

Manual mode 

Use: 
For testing and maintenance tasks. 

 

Start: 
Press "Manual" on the controller. The Auto LED at the operator panel flashes to 
visually indicate that Manual mode is active. 

 

Functions: 
Selecting the functions depends on the set make-up variant, "Levelcontrol" or 
"Magcontrol".  
Manual mode allows you to select the following functions and to perform a test 
run: 

 

Manual and deactivation of the "PU" pump with "Levelcontrol" 

 

Manual switching on and off of the "PU" pump or "Filling" in the 
"Magcontrol" make-up variant. 

 
1. 

At the controller's operator panel, use the arrow keys to select the "PU" 
pump or "Fill" function.  

2. 

Press "OK" at the controller's operator panel to switch on the "PU" pump or 
"FIll" function. 

  "PU!" or "Fill!" is displayed to visually indicate that the 

pump is being switched on.  

3. 

Press "OK" at the controller's operator panel to switch off the "PU" pump or 
"FIll" function. Displays "PU" or "Fill" to visually indicate that the pump is 
being switched off. 

 



Note! 
The controller calculates the pressure required for filling. As soon as this 
value has been attained, the controller automatically stops the filling 
process. 

 



Note! 
Manual operations cannot be performed if safety-relevant parameters 
would be exceeded. Switching is then disabled. 

 
8.1.3

 

Stop mode 

Use: 
For device commissioning 

 

Start: 
Press "Stop" on the controller. The Auto LED at the operator panel extinguishes. 

 

Functions: 
Except for the display of information, the device is non-functional in Stop mode. 
Function monitoring is stopped. 

 

The "PU" pump is switched off. 

 



Note! 
The system returns an alarm if the Stop mode is activated for more than 
4 hours. 
If "Floating alarm contact?" in the Customer menu is set to "Yes", the 
system outputs the alarm to the group alarm contact. 

 
8.1.4

 

Summer operation 

Use: 
The make-up with mains water must be ensured even when the heating and 
cooling systems are not operating. Do not shut down the device when the 
pressurisation of the heating and cooling systems are in operation.  
 

Содержание Fillcontrol Auto

Страница 1: ...Fillcontrol Auto 22 09 2020 Rev C GB Operating manual Original operating manual...

Страница 2: ...cal connection 8 6 5 1 Terminal diagram 8 6 5 2 RS 485 interface 9 6 6 Installation and commissioning certificate 9 7 Commissioning 9 7 1 Requirements for initial commissioning 9 7 2 Determining the P...

Страница 3: ...ult in death or severe irreversible injuries WARNING Serious damage to health The sign in combination with the signal word Warning indicates imminent danger failure to observe the safety information c...

Страница 4: ...stems Solar circuits The device is used in combination with a user supplied open system separator tank Note An application without system separator tank is possible For customised design and adjustmen...

Страница 5: ...For calculating the filling pressure into the system circuit see chapter 7 2 Determining the P0 minimum operating pressure for the controller on page 9 Adding water to system circuits with a pressuris...

Страница 6: ...possible transport damage 2 Document any damage 3 Contact the forwarding agent to register your complaint 6 2 Preparatory work Preparing the device installation Frost free well ventilated room Room te...

Страница 7: ...n open system separator tank Make up temperatures up to 70 C Pipeline lengths see chapter 6 3 1 Floor mounting on page 6 Outlet from the system separator tank at least 100 mm above the intake connecti...

Страница 8: ...electric shock Some parts of the device s circuit board may still carry 230 V voltage even with the device physically isolated from the power supply Before you remove the covers completely isolate the...

Страница 9: ...ng and the annual maintenance 7 1 Requirements for initial commissioning The device will be ready for initial commissioning when the tasks described in the Installation chapter have been completed Not...

Страница 10: ...h Magcontrol make up variant Calculation of the minimum operating pressure see chapter 7 2 Determining the P0 minimum operating pressure for the controller on page 9 Safety valve pressure Enter the va...

Страница 11: ...operation can be started after initial commissioning The following prerequisites must be met for automatic operation P0 minimum working pressure is entered in the controller The device is filled with...

Страница 12: ...sioning the factory settings must first be adjusted for the system specific conditions Note For a description of the operation see chapter 9 1 Operator panel on page 12 All grey marked menu items must...

Страница 13: ...ble soft water capacity Replacement 18 months This value is only displayed if YES has been set in the With softening menu option Manufacturer specification for the replacement interval of the softenin...

Страница 14: ...an the dirt trap Replace the float valve 04 1 Pump YES Pump does not start PU pump is stuck Pump motor defective 10 A fuse defective Contractor Klixon tripped Manually turn the pump to start Replace t...

Страница 15: ...ons Ensure that installation work for the electric connection of the device is carried out by an electrician and in compliance with electrical engineering regulations CAUTION Risk of injury due to pre...

Страница 16: ...ore you remove the covers completely isolate the device controller from the power supply Verify that the main circuit board is voltage free CAUTION Risk of burns Escaping hot medium can cause burns Ma...

Страница 17: ...Installation and commissioning certificate This device has been installed and commissioned in accordance with the instructions provided in the operating manual The settings in the controller match th...

Страница 18: ...SI1415enC 11 20 Reflex Winkelmann GmbH Gersteinstra e 19 59227 Ahlen Germany 49 0 2382 7069 0 49 0 2382 7069 9546 www reflex winkelmann com...

Отзывы: