background image

 

 

 

 

 

Fillcontrol Auto 

22.09.2020 - Rev. C 

 

  
  
  
  

 

 

 
 
 
 

 

GB 

 

Operating manual 

Original operating manual 

 

 

 

 

 
 

 

 

 

 

 

Содержание Fillcontrol Auto

Страница 1: ...Fillcontrol Auto 22 09 2020 Rev C GB Operating manual Original operating manual...

Страница 2: ...cal connection 8 6 5 1 Terminal diagram 8 6 5 2 RS 485 interface 9 6 6 Installation and commissioning certificate 9 7 Commissioning 9 7 1 Requirements for initial commissioning 9 7 2 Determining the P...

Страница 3: ...ult in death or severe irreversible injuries WARNING Serious damage to health The sign in combination with the signal word Warning indicates imminent danger failure to observe the safety information c...

Страница 4: ...stems Solar circuits The device is used in combination with a user supplied open system separator tank Note An application without system separator tank is possible For customised design and adjustmen...

Страница 5: ...For calculating the filling pressure into the system circuit see chapter 7 2 Determining the P0 minimum operating pressure for the controller on page 9 Adding water to system circuits with a pressuris...

Страница 6: ...possible transport damage 2 Document any damage 3 Contact the forwarding agent to register your complaint 6 2 Preparatory work Preparing the device installation Frost free well ventilated room Room te...

Страница 7: ...n open system separator tank Make up temperatures up to 70 C Pipeline lengths see chapter 6 3 1 Floor mounting on page 6 Outlet from the system separator tank at least 100 mm above the intake connecti...

Страница 8: ...electric shock Some parts of the device s circuit board may still carry 230 V voltage even with the device physically isolated from the power supply Before you remove the covers completely isolate the...

Страница 9: ...ng and the annual maintenance 7 1 Requirements for initial commissioning The device will be ready for initial commissioning when the tasks described in the Installation chapter have been completed Not...

Страница 10: ...h Magcontrol make up variant Calculation of the minimum operating pressure see chapter 7 2 Determining the P0 minimum operating pressure for the controller on page 9 Safety valve pressure Enter the va...

Страница 11: ...operation can be started after initial commissioning The following prerequisites must be met for automatic operation P0 minimum working pressure is entered in the controller The device is filled with...

Страница 12: ...sioning the factory settings must first be adjusted for the system specific conditions Note For a description of the operation see chapter 9 1 Operator panel on page 12 All grey marked menu items must...

Страница 13: ...ble soft water capacity Replacement 18 months This value is only displayed if YES has been set in the With softening menu option Manufacturer specification for the replacement interval of the softenin...

Страница 14: ...an the dirt trap Replace the float valve 04 1 Pump YES Pump does not start PU pump is stuck Pump motor defective 10 A fuse defective Contractor Klixon tripped Manually turn the pump to start Replace t...

Страница 15: ...ons Ensure that installation work for the electric connection of the device is carried out by an electrician and in compliance with electrical engineering regulations CAUTION Risk of injury due to pre...

Страница 16: ...ore you remove the covers completely isolate the device controller from the power supply Verify that the main circuit board is voltage free CAUTION Risk of burns Escaping hot medium can cause burns Ma...

Страница 17: ...Installation and commissioning certificate This device has been installed and commissioned in accordance with the instructions provided in the operating manual The settings in the controller match th...

Страница 18: ...SI1415enC 11 20 Reflex Winkelmann GmbH Gersteinstra e 19 59227 Ahlen Germany 49 0 2382 7069 0 49 0 2382 7069 9546 www reflex winkelmann com...

Отзывы: