4
Any revisions must first be approved by the product designer. Version: 201808
Revision By: JST
7.
CRITICAL SEAL
Remove the dust and dirt first. Seal
the connection between the glass
receiver channel
and the base
glazing channel
with clear silicon,
prior to the
installation of
panel
B
and
C.
Ensure junction between
wall channel and base channel is full of
silicon before final glass placement.
8.
INSTALLATION OF RETURN PANEL
Locate panel
B
into the glazing channels.
The top of panel
B
must be level with the
top of the opposite glass receiver channel.
Adjust the height of the panel if necessary
by adding or removing the plastic packers
in the base glazing channel.
9.
INSTALLATION OF FIXED PANEL
Locate panel
C
into the glazing channels.
The top of panel
B
must be level with the
top of panel
C
. Adjust the height of the
panel if necessary by adding or removing
the plastic
packers in
the base
glazing
channel.
10.
SILL INFILL
Apply a continuous bead of clear silicon to
each inside face of the base channel.
Ensure the ends of the infill are sealed
and place into the base channel in the
location as shown.
Содержание Atlantis Glacier SFK-GL-HR
Страница 1: ...SFK GL HR...