INSTALLING THE LWSS UNIT

Choose a flat even surface. Wooden bearers are not essential as the unit sits on a ring stand.  The unit
must be installed vertically.

Please install in an area that will be accessible in the future.  When first fixing take into account that
the connections and controls will be front facing to facilitate access.

Check that the floor will support the unit when it is full of water. See page 14 for weights.

COLD FEED

Minimum mains pipework of 25mm MDPE or 22mm copper is advised.  If 15mm copper or 1/2" lead is
the only mains feed then the decision to install rests with the installer or specifier of the product.  Flow
rates will be compromised, even at appropriate pressures, ensure that you have at least 18 litres per
minute at the bath tap. Maximum inlet pressure is 12 bar. 

If multiple bath filling or showering is required, mains feed may need to be 32mm MDPE or 28mm copper.

The unit operates at 3 bar and pressures from 2 bar upwards are suitable.  Lower pressure will result in
a fall in flow rate.  A flow rate of 20 litres per minute is a minimum requirement for single bath
applications and must rise proportionately for greater demands.

1

PRESSURE AND

TEMPERATURE

RELIEF VALVE

INSULATION

COLD MAINS

VIA GROUPSET

HOT DOMESTIC

WATER

IMMERSION

HEATERS

EXPANSION

VESSEL

(SUPPLIED LOOSE)

APPLIED ENERGY PRODUCTS LTD

STAINLESS STEEL UNVENTED HOT WATER STORAGE UNITS

PRESSURE AND

TEMPERATURE

RELIEF VALVE

INSULATION

COLD MAINS

VIA GROUPSET

HOT DOMESTIC

WATER

PRIMARY

TAPPINGS

DUAL

THERMOSTAT

IMMERSION

HEATER

EXPANSION

VESSEL

(SUPPLIED LOOSE)

INDIRECT

DIRECT

Please read the following carefully before installation of the product.  You should be competent to install
the unvented system as defined by the regulations.  Special attention must be paid to maintenance and
service. 

Please keep the unit packaged until you are ready to commence installation. Store the unit in a dry area,
keep it vertical and ensure that all safety components are kept in the box.

IT IS A REQUIREMENT THAT THIS UNIT IS SERVICED AND MAINTAINED ANNUALLY – THE BENCHMARK
LOG BOOK MUST BE COMPLETED AND UPDATED.  FAILURE TO DO SO WILL INVALIDATE GUARANTEES.

THE DIRECT & INDIRECT UNITS

New Stainless imp_alt  2/15/05  12:15 PM  Page 2

Содержание LWSS STAINLESS STEEL

Страница 1: ...R LWSS STAINLESS STEEL UNVENTED WATER STORAGE HEATER APPLIED ENERGY PRODUCTS LTD TEL 08709 000430 THIS UNIT IS SUPPLIED BY INSTALLATION COMMISSIONING MAINTENANCE...

Страница 2: ...re will result in a fall in flow rate A flow rate of 20 litres per minute is a minimum requirement for single bath applications and must rise proportionately for greater demands 1 PRESSURE AND TEMPERA...

Страница 3: ...RESSURE GAUGE EXPANSION VESSEL OPTIONAL DRAIN POINT EXPANSION VALVE COLD TAPS COLD FEED 22mm EXPANSION VALVE 22mm TUNDISH 15mm 15mm PRESSURE AND TEMPERATURE RELIEF VALVE 2 DISCHARGE Both the pressure...

Страница 4: ...ween 9m and 18m equivalent resistance length should be at least larger than the nominal outlet size of the safety device between 18m and 27m at least 3 sizes larger and so on Bends must taken into acc...

Страница 5: ...systems so that any installation can be traced reasonably easily The single common discharge pipe should be at least one pipe size larger than the largest individual discharge pipe to be connected If...

Страница 6: ...up to 9m up to 18m up to 27m up to 9m up to 18m up to 27m 22mm 28mm 35mm 28mm 35mm 42mm 35mm 42mm 54mm 15mm 22mm 28mm G1 2 G3 4 G1 0 8m 1 0m 1 4m 1 0m 1 4m 1 7m 1 4m 1 7m 2 3m GUIDANCE NOTES TYPICAL D...

Страница 7: ...y HOT WATER OUTLETS Dynamic pressure always drops across a system when more than one outlet is opened The unit has a working pressure of 3 bar Good system design should take this into consideration pi...

Страница 8: ...with a 3mm contact gap separation Appropriate wiring for the electrical load must be used The twin immersion heaters supplied with direct units can be switched to utilise low tariff electricity supply...

Страница 9: ...75 or CP15 Programmer L C 2 C 2 1 Power Supply E Junction Box N L G Y BR BL 2 4 1 ITD Dual Stat ITD Dual Stat The wiring diagram for Danfoss systems is given as guidance For modified Danfoss Randall Y...

Страница 10: ...rammers recommended are FP715 7 5 and 2 day programming and the CP15 5 2 and 24 hour programming S PLAN Zone Valve Htg Room Stat Zone Valve DHW HP22 1 2 2 8 9 10 7 6 5 4 3 2 1 1 2 3 2 3 3 2 2 1 RMT 23...

Страница 11: ...e FP715 7 5 and 2 day programming and the CP15 5 2 and 24 hour programming 8 9 10 7 6 5 4 3 2 1 2 1 2 3 3 3 2 2 1 L N E L N E Htg On Dhw On Dhw Off L L N 4 3 1 NOT USED N E Basic Boiler 2 Port Valve P...

Страница 12: ...he charge should be checked with an accurate pressure gauge and maintained at 3 0 bar If the reading is less than 3 0 bar to recharge the vessel ensure that the unit is decommissioned by turning off t...

Страница 13: ...RE SET TEMPERATURE HIGH LIMIT CUT OUT C TEMPERATURE AND PRESSURE RELIEF VALVE D EXPANSION RELIEF VALVE E PRESSURE REDUCING VALVE LINE STRAINER F EXPANSION VESSEL SUPPLIED LOOSE G NON RETURN VALVE H PR...

Страница 14: ...WITH MANUAL RE SET TEMPERATURE HIGH LIMIT CUT OUT C TEMPERATURE AND PRESSURE RELIEF VALVE D EXPANSION RELIEF VALVE E PRESSURE REDUCING VALVE LINE STRAINER F EXPANSION VESSEL SUPPLIED LOOSE G NON RETUR...

Страница 15: ...IMMERSION HIGH LIMIT THERMOSAT IMMERSION CONTROL THERMOSTAT EXPANSION VESSEL UP TO 170 LITRE MODELS EXPANSION VESSEL FOR 200 250 LITRE MODELS TUNDISH INSTALLATION GUIDE LABEL CYLINDER THERMOSTAT 2 PO...

Страница 16: ...priately approved competent personnel following relevant Code of Practice 5 Installation must be in an appropriate location and use is restricted to potable water Please note that the extended guarant...

Страница 17: ...H LIMIT CUT OUT IS ALL WIRING TO THE CONTROLS OK YES NO NO NO NO YES RE SET YES REPLACE THERMOSTAT RE WIRE IS CONTROL TEMPERATURE SET AT 55 o C 60o C YES NO RE SET SET PROGRAMME IS BOILER ON START YES...

Страница 18: ...G NO HOT WATER DIRECT IS POWER ON TO ELEMENTS IS CONTROL TEMPERATURE SET AT 55 o C 60o C START END YES HAS HIGH LIMIT TRIPPED YES NO NO NO YES CHECK WIRING LINKS CONTINUITY AND RE SET REPLACE ELEMENT...

Страница 19: ...URE ADEQUATE IS IN LINE STRAINER IN PRV DIRTY START END YES IS PRV FAULTY IS SYSTEM FREE FROM RESTRICTIONS BLOCKAGES NO YES YES NO YES NO NO WATER SERVICE CHECK BY SUPPLYCOMPANY REQUIRED CLEAN OR REPL...

Страница 20: ...o C IS EXPANSION VESSEL CHARGE CORRECT IS ERV TPRV DISCHARGING REPLACE ERV TPRV RESET TEMPERATURE END CLEAN OR REPLACE AS REQUIRED RECOMMISSION EXPANSION LEVEL RE CALIBRATE PRV IS VALVE SEAL AND SEAT...

Страница 21: ...CE 2 DATE ENGINEER NAME COMPANY NAME TEL No ID SERIAL No COMMENTS SIGNATURE SERVICE 3 DATE ENGINEER NAME COMPANY NAME TEL No ID SERIAL No COMMENTS SIGNATURE SERVICE 4 DATE ENGINEER NAME COMPANY NAME T...

Страница 22: ...PRESSURE BAR HAS STRAINER IF FITTED BEEN CLEANED OF INSTALLATION DEBRIS YES NO HAS A WATER TREATMENT DEVICE BEEN FITTED YES NO IF YES TO ABOVE THEN WHAT TYPE ALL MAINS PRESSURE SYSTEMS ARE T P AND EX...

Страница 23: ...etc CUSTOMER DETAILS NAME ADDRESS TEL No INSTALLER DETAILS NAME DATE ADDRESS TEL NO REGISTRATION DETAILS Where applicable for unvented systems etc REG No ID SERIAL No etc COMMISSIONING ENGINEER DETAI...

Страница 24: ...ustomer APPLIANCE DETAILS COMMISSIONING RECORDS SERVICE INTERVAL RECORD IMPORTANT FAILURE TO INSTALL COMMISSION THIS APPLIANCE TO THE MANUFACTURER S INSTRUCTIONS MAY INVALIDATE THE WARRANTY This note...

Отзывы: