15
Replacing the conveyor belt
-
Loosen the nuts (1) and release the conveyor belt in the direction of the
arrow.
-
Loosen the grub screws of the bearings (2) towards the driving direction on
the right.
-
Remove the brush roller (4) by loosening the screws (3).
-
Take off the right side panel (6) by removing the screws (5).
-
Pull the conveyor belt (7) out to the right.
Mounting is carried out in reverse order.
Conveyor belt tightening after mounting
-
Tighten the conveyor belt on both sides and evenly with the nuts (1), until
the axle center-to-center distance of the front shaft to the rear shaft is 491
mm.
-
Allow the conveyor belt to run for approximately 30 minutes until it is
centered.
-
When operating the machine after a conveyor belt replacement, a slippage
of the conveyor belt can occur. If necessary, tighten the band again. Pay
attention to uniform tightening on both sides (see conveyor belt tightening,
page 10).
The conveyor belt must not touch the sides. When readjusting the conveyor
belt, tighten on the side on which the band touches.
Excessive tightening shortens the life of the conveyor belt.
Chain tightening
Содержание RINK SP950
Страница 14: ...14 Replacing the conveyor belt...