P9
12
STEP 3 B – SOLID CONCRETE
Drill pilot hole
Realice el agujero piloto
Percez le trou de guidage
DRILL BIT
NOT INCLUDED
Solid Concrete
Concreto sólido
Béton massif
STEP 3B – DRILL PILOT HOLE AND MOUNT WALL PLATE
13
Ratchet Handle
3/8”
Secure top lag bolt first.
If necessary, use slot at
bottom to level wall plate
prior to tightening lower
lag bolt.