25
USER MANUAL
▪
Red Rooster Lifting Limited
▪
Nauta House, The Meadows, Oldmeldrum, Aberdeenshire, AB51 0EZ
▪
Tel: +44 (0) 1651 872101
▪
M01-AH6 REV3
CHAIN COLLECTORS
6.1
When supplied new the chain bag or chain bucket will have been sized to suit the HOL of the hoist with spare capacity to allow for some
bunching up of the chain. The use of a chain collector can make the operation of the hoist more efficient preventing dangerous occurrences
with the chain getting caught or falling from the load being lifted as it mounts up on top of the load.
On hoists from 250 kg to 2 tonne PVC bags are used with chain sizes from 4 to 11.2mm diameter.
On hoists from 250 kg to 2 tonne with a high HOL and chain sizes over 11.2mm, galvanised chain collectors are used, with stainless steel
buckets being used on UK Ex / ATEX hoists and in areas of high corrosion.
On arrival at site the load chain should be removed from the chain collector either manually or by carefully running out of the hoist checking for
snagging. The chain should then be run back into the collector by the hoist checking there are no twists in the chain that the bottom hook is not
twisted through the chain fall on multi-fall blocks.
Hoists with long drops of chain and heavy loads in the chain collectors will require a secondary suspension point to hold the hoist in a vertical
position when unloaded. These may be as shown in section 1.8 or a secondary trolley on a runway beam.
If operating without a chain collector the slack end of the chain may catch or get caught on top of a load.
Always make sure the unloaded chain is running freely.
▪
Do not exceed the chain collector capacity.
▪
When the load chain is dry it may not run freely into the chain collector and over fill the collector, so the chain must be kept lubricated to
prevent it running out of the collector.
▪
Make sure the chain collector brackets have not been damaged during installation.
▪
Make sure the chain collector is free to move when the hoist is loaded and un-loaded.
▪
Make sure the bottom hook does not connect with the chain collector. Limit the lifting height of the bottom hook if necessary.
▪
For any assistance required on chain collectors please contact Red Rooster Lifting Ltd.
DANGER
CAUTION
CAUTION
CAUTION
CAUTION
PART NO
TCR-250
TCR-500/2
TCS-50O
TCR-500
TCS-980/2
TCR-1000/2
TCR-1000
TCR-2000/2
BAG1
13
7
BAG2
25 13
BAG3
6
3
6
3
BAG4
9
4.5
9
4.5
BAG5
13
7
13
7
BAG6
12
6
BAG7
20
10
BAG8
MAX HOL
(m)
HOIST
Содержание TCR-1000
Страница 1: ...AIR HOIST USER MANUAL MODEL TCR 2000 2...
Страница 2: ......
Страница 37: ...D01 AH6 REV3 17 09 15 Hoist Body TCR 2000 2...
Страница 40: ...D01 AH6 REV3 17 09 15 Pendant Body TCR 2000 2...
Страница 42: ...D01 AH6 REV3 17 09 15 Built In Mains Emergency Stop Valve Pendant Body TCR 2000 2...
Страница 44: ...D01 AH6 REV3 17 09 15 Cord Body TCR 2000 2...
Страница 50: ......
Страница 56: ......