LAYING UP THE HOIST
5.1
LAYING UP THE HOIST
Whenever the hoist is unused for a period ( weekends, holidays or in store ), a little preparation will ensure that the hoist operates correctly
and safely, either before being put into service for the first time or when being put back into service after a layup.
SHORT LAY UP PERIOD (2 TO 90 DAYS):
Air hoists should be kept clean, lubricated and stored in a clean and dry location.
When not in use seal off from the air supply inlet as per lay up instructions.
Wherever possible keep the hoist protected when in use and installed in an exposed location, protecting controls and hoses from damage.
LONG TERM LAY UP PERIOD (3 MONTHS TO 24 MONTHS):
▪
If the hoist is contaminated with dirt or chemicals, wash with a propriety mild solvent or detergent and thoroughly rinse off with fresh
water. Allow to dry and spray lightly with penetrating fluid.
▪
Lubricate the load chain, limit shafts, safety latches, and hook swivels.
▪
Disconnect the air supply and plug the inlet port.
▪
If required, dismantle the chain collector, pendant, air set and trolley for storage.
▪
Store in a dry ventilated area.
▪
Secure hoist in a crate or suitable pallet.
Transportation - Moving your Red Rooster hoist between locations.
Carefully disconnect from suspension point and lower under control to ground level.
Be sure that chain collector, valves and trolley drives are not damaged.
Carefully lay the pendant on top of the hoist making sure tubes or hoses are not damaged.
Secure the hoist and chain to the shipping container or pallet.
For long term storage corrosion inhibitors (wax coatings) can also be applied to suitable surfaces and then removed before use.
If being stored long term especially outside ask for a copy of the full procedure - AHLU-15
Содержание TC5-500-LF
Страница 1: ...LUBE FREE AIR HOIST USER MANUAL MODEL TCS 500 LF...
Страница 2: ......
Страница 35: ...D01 AH12 LF REV0 17 09 15 Brake Gears Suspension Body TCS 500 LF...
Страница 37: ...D01 AH12 LF REV0 17 09 15 Motor Valve Body TCS 500 LF Pendant...
Страница 39: ...D01 AH12 LF REV0 17 09 15 Motor Valve Body TCS 500 LF Cord...
Страница 41: ...D01 AH12 LF REV0 17 09 15 D01 P7 REV1 Pendant VRD 2R...
Страница 43: ...D01 AH12 LF REV0 17 09 15 D01 P2 REV1 Pendant VTP2M...
Страница 48: ......