![Red Heating MALVA MULTIAIR 10 UP! S1 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/red-heating/malva-multiair-10-up-s1/malva-multiair-10-up-s1_installation-manual_1427615033.webp)
v
v
d
b
Z
T
C
y
H
31
7-CONTROL PANEL ASSEMBLY FOR LEFT OPENING
Technical Dept. - All rights reserved - Reproduction prohibited
now:
•
cable “
C
” will be connected in board to the stove, but disconnected from the panel
•
panel “
T
” will be completely disconnected
•
the panel support “
Z
” will be independent from the stove
•
there are two screws “
v
”, screw “
d
” and bushing “
b
”
•
open the cart and from below, remove the three screws “
y
”