25. This setup creates the system B installation method
supplying preheated water to the shower only. For system
A installations a T joint would be required to also send the
preheated water to the water heater.
26. Using 40mm push fit, or 43mm solvent weld pipe, connect
the warm shower water in to the bath shower trap. The
warm shower water in is the highest end of the .
29. Ensure the cold mains water is turned back on at the
stopcock. Open the full flow shut off valve on the mains
cold water feed to start the cold water flow into the .
30. Open the full flow shut off valve on the preheated water pipe
to start the flow from the
27. When the highest point is at the opposite end to bath trap
the pipes can be run above the lower profile section of the
.
28. Using 40mm push fit or 43mm solvent weld pipe, connect
the waste water out at the lower end of the unit
to the SVP soil pipe. Ensure all fixings are fully tightened
and sealed.
31. Replace any bath supports removed to allow access to
install the Recoup
32. Replace the bath panel and any supporting structure.
CONNECTING THE SHOWER WASTE
COMMISIONING THE