Table of contents
BAL_SYS20_RED_EN_2V2_REC_102-020110693
3/ 27
6
Manual opening and closing in case of failure (RED)..........................................
17
6.1
Manual opening (without manual unlocking device) ......................................................................
17
6.2
Manual closing ...............................................................................................................................
18
6.2.1
Step 1 .............................................................................................................................................
18
6.2.2
Step 2 .............................................................................................................................................
18
7
Emergency opening of the door (RED)...............................................................
20
7.1
Emergency opening with current supply ........................................................................................
20
7.2
Emergency opening in case of power failure with auxiliary battery (RED) ....................................
20
7.3
Emergency operating using Bowden cable (Option)......................................................................
20
7.3.1
Available versions ..........................................................................................................................
20
7.3.2
Procedure for an emergency opening............................................................................................
20
7.3.3
Closing and locking the door ..........................................................................................................
21
8
Behaviour in event of faults ................................................................................
22
8.1
Display on the control unit ..............................................................................................................
22
8.2
Possible troubleshooting ................................................................................................................
22
8.3
Resetting the control module .........................................................................................................
22
8.4
Control unit BDE-D does not react.................................................................................................
23
9
Functions and safety check ................................................................................
24
9.1
General remarks.............................................................................................................................
24
9.2
Monthly inspection work to be carried out by the operating company...........................................
25
10
Recommended and planned spare- and wear parts ...........................................
27