www.ReadyLIFT.com
-
Phone: (877) 759
-
9991
9
46
-
5780
-
IM
-
AA
Install the lower ball joint cradle using the
factory hardware
. Add a drop of thread
locker to the lower mounting hardware.
Torque the lower cradle hardware to
180 ft
-
lbs
.
Install the outer tie rod end to the knuckle
using the
factory hardware
.
Torque to the nut to
65 ft
-
lbs
.
Install the cotter pin.
Install the sway bar links to the lower con-
trol arms using the
factory hardware
.
Torque all to
55 ft
-
lbs
(Shown without coil
-
over assembly for
clarification).
Install the front wheels and lower the vehicle to the ground. Torque the lug nuts to
the wheel manufacturer specs.
Jounce the front suspension to settle the vehicle to ride height.
Center the lower control arm cams and torque to
100 ft
-
lbs
(final torque to be done
by alignment technician), the lower strut hardware to
125 ft
-
lbs
, and the upper strut
hardware to
35 ft
-
lbs
.