![Ready Rack FH2G Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/ready-rack/fh2g/fh2g_installation-operation-and-maintenance-manual_1424910007.webp)
FH2G
–
Express Dryer
Installation, Operation and Maintenance Manual
6 |
P a g e
Figure
–
Top Duct Guard
•
The diameter of the ducted tube should not be restricted less than 10” in diameter.
•
Runs longer than 10’ may require the use of a booster fan (not included) to ensure
pressure losses are overcome.
•
An external self-closing louvre should be utilized to keep out pests and rain water.
•
The use of legacy “square or rectangle” ducting is permitted, considering a minimum
dimension of 8” x 16”.
OPERATING THE DRYING CABINET
FIGURE: CONTROL PANEL
STEP ONE
•
Load gear or hose into the dryer.
•
Close door(s) and secure latch.