![Ready Rack FH2G Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/ready-rack/fh2g/fh2g_installation-operation-and-maintenance-manual_1424910010.webp)
FH2G
–
Express Dryer
Installation, Operation and Maintenance Manual
9 |
P a g e
Post-Drying:
•
Ensuring that the gear is properly stored is important to maintaining clean and dry and
protected. Utilizing a duty gear hanger or locker will ensure the gear is protected from dirt and
debris, as well as preventing mildew build-up.
MONTHLY INSPECTION
•
Clean and remove all debris and dust from inside the cabinet. Remove plenum from floor and
clean underneath.
•
Check for missing screws or guards.
•
Check unit for level and adjust feet as necessary.
•
Check the shelves and sliders for burrs and wear. Check that the sliders are secure.
•
Check all hanging rails supports for security.